ChargeCensus

2A Main Entrance Parking Lot

Available

EV charging station in Ogden, Utah on the Blink network — 2 Level 2. US DOE AFDC station 221423.

At a glance

2A Main Entrance Parking Lot is a public EV charging station at 550 W 2nd St. in Ogden, Utah, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 13, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID221423
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateMay 13, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: FREE

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
550 W 2nd St.
City
Ogden
State
Utah
ZIP
84404
Coordinates
41.26055, -111.99193

Within ~15 km

Nearby charging

What kind of charging does 2A Main Entrance Parking Lot offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the Utah average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “FREE”.

How does 2A Main Entrance Parking Lot compare with other stations in Ogden?

Ogden has 42 charging stations in the DOE registry with 95 ports, the 7th-most of 119 cities and towns in Utah. 2A Main Entrance Parking Lot accounts for 2% of the charging ports in Ogden. Blink runs 5 stations in Ogden. Statewide, Utah has 1,090 stations and 3,472 ports, the 23rd-largest station count of the 51 states and DC. The biggest station in Utah, Avia - The Exchange Apartments - SLC in Salt Lake City, has 38 ports.

Who operates 2A Main Entrance Parking Lot?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 69 of those stations are in Utah, 6% of the state's 1,090.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 13, 2021, one of 232 stations in Utah with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does 2A Main Entrance Parking Lot have?

2A Main Entrance Parking Lot has 2 charging ports: 2 Level 2.

Does 2A Main Entrance Parking Lot have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does 2A Main Entrance Parking Lot have?

2A Main Entrance Parking Lot has J1772 connectors.

Is charging at 2A Main Entrance Parking Lot free?

Pricing as reported to the DOE registry: FREE.

Is 2A Main Entrance Parking Lot open to the public?

Yes. 2A Main Entrance Parking Lot is listed with public access, and its status is available.

Where is 2A Main Entrance Parking Lot?

2A Main Entrance Parking Lot is at 550 W 2nd St., Ogden, UT 84404. Its coordinates are 41.26055, -111.99193.

More EV charging around Ogden

Working with Utah charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 221423, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “2A Main Entrance Parking Lot, Ogden, UT (AFDC station 221423)”, https://chargecensus.com/stations/utah/2a-main-entrance-parking-lot-221423 (data as of October 12, 2026).