Weststar Tower Level 2 Stn 1
AvailableEV charging station in El Paso, Texas on the ChargePoint network — 2 Level 2. US DOE AFDC station 199372.
At a glance
Weststar Tower Level 2 Stn 1 is a public EV charging station at 601 N Mesa St in El Paso, Texas, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 28, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 199372 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 28, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- Fort Bliss50 ports
Non-networked · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Blink · Available
- Fmcsa5 ports
Non-networked · Planned
- Walmart 512 (El Paso, TX)4 ports
Electrify America · Available
What kind of charging does Weststar Tower Level 2 Stn 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Texas average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Weststar Tower Level 2 Stn 1 compare with other stations in El Paso?
El Paso has 71 charging stations in the DOE registry with 199 ports, the 7th-most of 424 cities and towns in Texas. Weststar Tower Level 2 Stn 1 accounts for 1% of the charging ports in El Paso. ChargePoint runs 37 stations in El Paso. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.
Who operates Weststar Tower Level 2 Stn 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,882 of those stations are in Texas, 45% of the state's 4,155.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 28, 2021, one of 459 stations in Texas with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Weststar Tower Level 2 Stn 1 have?
Weststar Tower Level 2 Stn 1 has 2 charging ports: 2 Level 2.
Does Weststar Tower Level 2 Stn 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Weststar Tower Level 2 Stn 1 have?
Weststar Tower Level 2 Stn 1 has J1772 connectors.
Is Weststar Tower Level 2 Stn 1 open to the public?
Yes. Weststar Tower Level 2 Stn 1 is listed with public access, and its status is available.
Where is Weststar Tower Level 2 Stn 1?
Weststar Tower Level 2 Stn 1 is at 601 N Mesa St, El Paso, TX 79901. Its coordinates are 31.76182, -106.49019.
More EV charging around El Paso
Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 199372, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Weststar Tower Level 2 Stn 1, El Paso, TX (AFDC station 199372)”, https://chargecensus.com/stations/texas/weststar-tower-level-2-stn-1-199372 (data as of October 12, 2026).