ChargeCensus

Waco Hyundai

Available

EV charging station in Waco, Texas on the Blink network — 2 DC fast. US DOE AFDC station 460821.

At a glance

Waco Hyundai is a public EV charging station at 4200 South Jack Kultgen Expressway in Waco, Texas, on the Blink network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Jun 8, 2026.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID460821
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateJun 8, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
4200 South Jack Kultgen Expressway
City
Waco
State
Texas
ZIP
76711
Coordinates
31.50589, -97.14316

Within ~15 km

Nearby charging

What kind of charging does Waco Hyundai offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 42% below the Texas average of 3.5 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Waco Hyundai compare with other stations in Waco?

Waco has 17 charging stations in the DOE registry with 85 ports. Waco Hyundai accounts for 2% of the charging ports in Waco. It is the only Blink station in Waco. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.

Who operates Waco Hyundai?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 410 of those stations are in Texas, 10% of the state's 4,155.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 8, 2026, one of 379 stations in Texas with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Waco Hyundai have?

Waco Hyundai has 2 charging ports: 2 DC fast.

Does Waco Hyundai have DC fast charging?

Yes. The registry lists 2 DC fast ports at Waco Hyundai, with CCS connectors.

What connectors does Waco Hyundai have?

Waco Hyundai has CCS connectors.

Is Waco Hyundai open to the public?

Yes. Waco Hyundai is listed with public access, and its status is available.

Where is Waco Hyundai?

Waco Hyundai is at 4200 South Jack Kultgen Expressway, Waco, TX 76711. Its coordinates are 31.50589, -97.14316.

More EV charging around Waco

Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 460821, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Waco Hyundai, Waco, TX (AFDC station 460821)”, https://chargecensus.com/stations/texas/waco-hyundai-460821 (data as of October 12, 2026).