ChargeCensus

Spur CDJR

Available

EV charging station in Gatesville, Texas on the Blink network — 2 DC fast · 2 Level 2. US DOE AFDC station 456580.

At a glance

Spur CDJR is a public EV charging station at 106 Texas 36 in Gatesville, Texas, on the Blink network. It has 4 charging ports (2 DC fast · 2 Level 2) with J1772 and CCS connectors. The US DOE registry lists it as available, open since Mar 27, 2026.

Total ports
4
DC fast
2
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 3 nearby

Station record

DOE registry record

FieldValue
AFDC station ID456580
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateMar 27, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
106 Texas 36
City
Gatesville
State
Texas
ZIP
76528
Coordinates
31.43420, -97.71485

Within ~15 km

Nearby charging

What kind of charging does Spur CDJR offer?

Of its 4 ports, 2 are DC fast and 2 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 16% above the Texas average of 3.5 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.

How does Spur CDJR compare with other stations in Gatesville?

Gatesville has 4 charging stations in the DOE registry with 10 ports. Spur CDJR accounts for 40% of the charging ports in Gatesville. Blink runs 3 stations in Gatesville. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.

Who operates Spur CDJR?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 410 of those stations are in Texas, 10% of the state's 4,155.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 27, 2026, one of 379 stations in Texas with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Spur CDJR have?

Spur CDJR has 4 charging ports: 2 DC fast · 2 Level 2.

Does Spur CDJR have DC fast charging?

Yes. The registry lists 2 DC fast ports at Spur CDJR, with CCS connectors.

What connectors does Spur CDJR have?

Spur CDJR has J1772 and CCS connectors.

Is Spur CDJR open to the public?

Yes. Spur CDJR is listed with public access, and its status is available.

Where is Spur CDJR?

Spur CDJR is at 106 Texas 36, Gatesville, TX 76528. Its coordinates are 31.43420, -97.71485.

More EV charging around Gatesville

Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 456580, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Spur CDJR, Gatesville, TX (AFDC station 456580)”, https://chargecensus.com/stations/texas/spur-cdjr-456580 (data as of October 12, 2026).