ChargeCensus

Shamaley Ford Pwrlink 2000-2

Available

EV charging station in El Paso, Texas on the ChargePoint network — 2 DC fast. US DOE AFDC station 395235.

At a glance

Shamaley Ford Pwrlink 2000-2 is a public EV charging station at 11301 Gateway Blvd W in El Paso, Texas, on the ChargePoint network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since May 8, 2025.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID395235
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 8, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
11301 Gateway Blvd W
State
Texas
ZIP
79936
Coordinates
31.73936, -106.32309

Within ~15 km

Nearby charging

What kind of charging does Shamaley Ford Pwrlink 2000-2 offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 42% below the Texas average of 3.5 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Shamaley Ford Pwrlink 2000-2 compare with other stations in El Paso?

El Paso has 71 charging stations in the DOE registry with 199 ports, the 7th-most of 424 cities and towns in Texas. Shamaley Ford Pwrlink 2000-2 accounts for 1% of the charging ports in El Paso. ChargePoint runs 37 stations in El Paso. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.

Who operates Shamaley Ford Pwrlink 2000-2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,882 of those stations are in Texas, 45% of the state's 4,155.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 8, 2025, one of 700 stations in Texas with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Shamaley Ford Pwrlink 2000-2 have?

Shamaley Ford Pwrlink 2000-2 has 2 charging ports: 2 DC fast.

Does Shamaley Ford Pwrlink 2000-2 have DC fast charging?

Yes. The registry lists 2 DC fast ports at Shamaley Ford Pwrlink 2000-2, with CCS connectors.

What connectors does Shamaley Ford Pwrlink 2000-2 have?

Shamaley Ford Pwrlink 2000-2 has CCS connectors.

Is Shamaley Ford Pwrlink 2000-2 open to the public?

Yes. Shamaley Ford Pwrlink 2000-2 is listed with public access, and its status is available.

Where is Shamaley Ford Pwrlink 2000-2?

Shamaley Ford Pwrlink 2000-2 is at 11301 Gateway Blvd W, El Paso, TX 79936. Its coordinates are 31.73936, -106.32309.

More EV charging around El Paso

Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 395235, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Shamaley Ford Pwrlink 2000-2, El Paso, TX (AFDC station 395235)”, https://chargecensus.com/stations/texas/shamaley-ford-pwrlink-2000-2-395235 (data as of October 12, 2026).