ChargeCensus

Sewell Cadillac of Grapevine

Available

EV charging station in Grapevine, Texas on the Blink network — 2 DC fast. US DOE AFDC station 387221.

At a glance

Sewell Cadillac of Grapevine is a public EV charging station at 1001 East State Highway 114 in Grapevine, Texas, on the Blink network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Mar 4, 2025.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID387221
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateMar 4, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
1001 East State Highway 114
State
Texas
ZIP
76051
Coordinates
32.92412, -97.06371

Within ~15 km

Nearby charging

What kind of charging does Sewell Cadillac of Grapevine offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 42% below the Texas average of 3.5 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Sewell Cadillac of Grapevine compare with other stations in Grapevine?

Grapevine has 27 charging stations in the DOE registry with 107 ports, the 21st-most of 424 cities and towns in Texas. Sewell Cadillac of Grapevine accounts for 2% of the charging ports in Grapevine. Blink runs 10 stations in Grapevine. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.

Who operates Sewell Cadillac of Grapevine?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 410 of those stations are in Texas, 10% of the state's 4,155.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 4, 2025, one of 700 stations in Texas with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Sewell Cadillac of Grapevine have?

Sewell Cadillac of Grapevine has 2 charging ports: 2 DC fast.

Does Sewell Cadillac of Grapevine have DC fast charging?

Yes. The registry lists 2 DC fast ports at Sewell Cadillac of Grapevine, with CCS connectors.

What connectors does Sewell Cadillac of Grapevine have?

Sewell Cadillac of Grapevine has CCS connectors.

Is Sewell Cadillac of Grapevine open to the public?

Yes. Sewell Cadillac of Grapevine is listed with public access, and its status is available.

Where is Sewell Cadillac of Grapevine?

Sewell Cadillac of Grapevine is at 1001 East State Highway 114, Grapevine, TX 76051. Its coordinates are 32.92412, -97.06371.

More EV charging around Grapevine

Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 387221, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Sewell Cadillac of Grapevine, Grapevine, TX (AFDC station 387221)”, https://chargecensus.com/stations/texas/sewell-cadillac-of-grapevine-387221 (data as of October 12, 2026).