ChargeCensus

San Antonio TX- TPG

Available

EV charging station in San Antonio, Texas on the Shell Recharge network — 7 DC fast. US DOE AFDC station 360343.

At a glance

San Antonio TX- TPG is a public EV charging station at 25200 I-10, San Antonio, TX 78 in San Antonio, Texas, on the Shell Recharge network. It has 7 charging ports (7 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Oct 19, 2024.

Total ports
7
DC fast
7
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID360343
NetworkShell Recharge
StatusAvailable (E)
AccessPublic
Open dateOct 19, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Shell Recharge

Operates 87 stations in the DOE registry — view the full network →

Location

Address
25200 I-10, San Antonio, TX 78
State
Texas
ZIP
78257
Coordinates
29.67577, -98.63456

Within ~15 km

Nearby charging

What kind of charging does San Antonio TX- TPG offer?

Of its 7 ports, 7 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about twice the Texas average of 3.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does San Antonio TX- TPG compare with other stations in San Antonio?

San Antonio has 242 charging stations in the DOE registry with 729 ports, the 4th-most of 424 cities and towns in Texas. San Antonio TX- TPG accounts for under 1% of the charging ports in San Antonio. Shell Recharge runs 4 stations in San Antonio. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.

Who operates San Antonio TX- TPG?

Formerly Greenlots — Shell's charging network. Shell Recharge operates 87 stations in the registry across 15 states, with 563 DC fast and 71 Level 2 ports in total. 34 of those stations are in Texas, under 1% of the state's 4,155.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 19, 2024, one of 715 stations in Texas with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does San Antonio TX- TPG have?

San Antonio TX- TPG has 7 charging ports: 7 DC fast.

Does San Antonio TX- TPG have DC fast charging?

Yes. The registry lists 7 DC fast ports at San Antonio TX- TPG, with CHAdeMO and CCS connectors.

What connectors does San Antonio TX- TPG have?

San Antonio TX- TPG has CHAdeMO and CCS connectors.

Is San Antonio TX- TPG open to the public?

Yes. San Antonio TX- TPG is listed with public access, and its status is available.

Where is San Antonio TX- TPG?

San Antonio TX- TPG is at 25200 I-10, San Antonio, TX 78, San Antonio, TX 78257. Its coordinates are 29.67577, -98.63456.

More EV charging around San Antonio

Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 360343, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “San Antonio TX- TPG, San Antonio, TX (AFDC station 360343)”, https://chargecensus.com/stations/texas/san-antonio-tx-tpg-360343 (data as of October 12, 2026).