Rgec1 Rio Grande Ec
AvailableEV charging station in Brackettville, Texas on the ChargePoint network — 2 Level 2. US DOE AFDC station 372978.
At a glance
Rgec1 Rio Grande Ec is a public EV charging station at 778 U.S. 90 in Brackettville, Texas, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 14, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 372978 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 14, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 778 U.S. 90
- City
- Brackettville
- State
- Texas
- ZIP
- 78832
- Coordinates
- 29.30440, -100.40969
Within ~15 km
Nearby charging
No other registered stations within ~15 km.
What kind of charging does Rgec1 Rio Grande Ec offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Texas average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Rgec1 Rio Grande Ec compare with other stations in Brackettville?
Brackettville has 1 charging station in the DOE registry with 2 ports. It is the only ChargePoint station in Brackettville. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.
Who operates Rgec1 Rio Grande Ec?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,882 of those stations are in Texas, 45% of the state's 4,155.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 14, 2024, one of 715 stations in Texas with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Rgec1 Rio Grande Ec have?
Rgec1 Rio Grande Ec has 2 charging ports: 2 Level 2.
Does Rgec1 Rio Grande Ec have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Rgec1 Rio Grande Ec have?
Rgec1 Rio Grande Ec has J1772 connectors.
Is Rgec1 Rio Grande Ec open to the public?
Yes. Rgec1 Rio Grande Ec is listed with public access, and its status is available.
Where is Rgec1 Rio Grande Ec?
Rgec1 Rio Grande Ec is at 778 U.S. 90, Brackettville, TX 78832. Its coordinates are 29.30440, -100.40969.
More EV charging around Brackettville
Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 372978, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Rgec1 Rio Grande Ec, Brackettville, TX (AFDC station 372978)”, https://chargecensus.com/stations/texas/rgec1-rio-grande-ec-372978 (data as of October 12, 2026).