ChargeCensus

Pie Ae West Lake Dc1

Available

EV charging station in Austin, Texas on the ChargePoint network — 1 DC fast. US DOE AFDC station 173218.

At a glance

Pie Ae West Lake Dc1 is a public EV charging station at 701 S Capital of Texas Hwy in Austin, Texas, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jan 27, 2021.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID173218
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
701 S Capital of Texas Hwy
City
Austin
State
Texas
ZIP
78746
Coordinates
30.29249, -97.82774

Within ~15 km

Nearby charging

What kind of charging does Pie Ae West Lake Dc1 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 71% below the Texas average of 3.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Pie Ae West Lake Dc1 compare with other stations in Austin?

Austin has 725 charging stations in the DOE registry with 1,961 ports, the most of 424 cities and towns in Texas. Pie Ae West Lake Dc1 accounts for under 1% of the charging ports in Austin. ChargePoint runs 583 stations in Austin. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.

Who operates Pie Ae West Lake Dc1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,882 of those stations are in Texas, 45% of the state's 4,155.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 459 stations in Texas with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Pie Ae West Lake Dc1 have?

Pie Ae West Lake Dc1 has 1 charging port: 1 DC fast.

Does Pie Ae West Lake Dc1 have DC fast charging?

Yes. The registry lists 1 DC fast port at Pie Ae West Lake Dc1, with CHAdeMO and CCS connectors.

What connectors does Pie Ae West Lake Dc1 have?

Pie Ae West Lake Dc1 has CHAdeMO and CCS connectors.

Is Pie Ae West Lake Dc1 open to the public?

Yes. Pie Ae West Lake Dc1 is listed with public access, and its status is available.

Where is Pie Ae West Lake Dc1?

Pie Ae West Lake Dc1 is at 701 S Capital of Texas Hwy, Austin, TX 78746. Its coordinates are 30.29249, -97.82774.

More EV charging around Austin

Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 173218, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Pie Ae West Lake Dc1, Austin, TX (AFDC station 173218)”, https://chargecensus.com/stations/texas/pie-ae-west-lake-dc1-173218 (data as of October 12, 2026).