Northside Ford
AvailableEV charging station in San Antonio, Texas, not on a charging network — 2 Level 2. US DOE AFDC station 63984.
At a glance
Northside Ford is a public EV charging station at 12300 San Pedro in San Antonio, Texas, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 1, 2014.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 63984 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Car dealership |
| Open date | Aug 1, 2014 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 12300 San Pedro
- City
- San Antonio
- State
- Texas
- ZIP
- 78216
- Coordinates
- 29.55131, -98.48529
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- TA I-10 East, San Antonio, TX12 ports
bp pulse · Available
Tesla Destination · Available
What kind of charging does Northside Ford offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Texas average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a car dealership location.
How does Northside Ford compare with other stations in San Antonio?
San Antonio has 242 charging stations in the DOE registry with 729 ports, the 4th-most of 424 cities and towns in Texas. Northside Ford accounts for under 1% of the charging ports in San Antonio. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.
Who operates Northside Ford?
Northside Ford is listed as non-networked: its chargers are not run through a charging-network account. Texas has 300 non-networked stations, 7% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 1, 2014, one of 18 stations in Texas with a 2014 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does Northside Ford have?
Northside Ford has 2 charging ports: 2 Level 2.
Does Northside Ford have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Northside Ford have?
Northside Ford has J1772 connectors.
Is charging at Northside Ford free?
Pricing as reported to the DOE registry: Free.
Is Northside Ford open to the public?
Yes. Northside Ford is listed with public access, and its status is available.
Where is Northside Ford?
Northside Ford is at 12300 San Pedro, San Antonio, TX 78216. Its coordinates are 29.55131, -98.48529.
More EV charging around San Antonio
Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 63984, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Northside Ford, San Antonio, TX (AFDC station 63984)”, https://chargecensus.com/stations/texas/northside-ford-63984 (data as of October 12, 2026).