ChargeCensus

Midsouth Charge Gibbons Crk Gr

Available

EV charging station in Anderson, Texas on the ChargePoint network — 1 DC fast. US DOE AFDC station 192997.

At a glance

Midsouth Charge Gibbons Crk Gr is a public EV charging station at 5015 Hwy30 in Anderson, Texas, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jul 21, 2021.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 3 nearby

Station record

DOE registry record

FieldValue
AFDC station ID192997
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJul 21, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
5015 Hwy30
City
Anderson
State
Texas
ZIP
77830
Coordinates
30.60212, -96.11668

Within ~15 km

Nearby charging

What kind of charging does Midsouth Charge Gibbons Crk Gr offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 71% below the Texas average of 3.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Midsouth Charge Gibbons Crk Gr compare with other stations in Anderson?

Anderson has 1 charging station in the DOE registry with 1 ports. It is the only ChargePoint station in Anderson. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.

Who operates Midsouth Charge Gibbons Crk Gr?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,882 of those stations are in Texas, 45% of the state's 4,155.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 21, 2021, one of 459 stations in Texas with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Midsouth Charge Gibbons Crk Gr have?

Midsouth Charge Gibbons Crk Gr has 1 charging port: 1 DC fast.

Does Midsouth Charge Gibbons Crk Gr have DC fast charging?

Yes. The registry lists 1 DC fast port at Midsouth Charge Gibbons Crk Gr, with CHAdeMO and CCS connectors.

What connectors does Midsouth Charge Gibbons Crk Gr have?

Midsouth Charge Gibbons Crk Gr has CHAdeMO and CCS connectors.

Is Midsouth Charge Gibbons Crk Gr open to the public?

Yes. Midsouth Charge Gibbons Crk Gr is listed with public access, and its status is available.

Where is Midsouth Charge Gibbons Crk Gr?

Midsouth Charge Gibbons Crk Gr is at 5015 Hwy30, Anderson, TX 77830. Its coordinates are 30.60212, -96.11668.

More EV charging around Anderson

Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 192997, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Midsouth Charge Gibbons Crk Gr, Anderson, TX (AFDC station 192997)”, https://chargecensus.com/stations/texas/midsouth-charge-gibbons-crk-gr-192997 (data as of October 12, 2026).