Ladera Bend Building 3
AvailableEV charging station in Austin, Texas on the ChargePoint network — 2 Level 2. US DOE AFDC station 162616.
At a glance
Ladera Bend Building 3 is a public EV charging station at 7300 Ranch Rd 2222 in Austin, Texas, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 12, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 162616 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 12, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- RESI EV Chargers86 ports
Blink · Available
Tesla Destination · Available
Tesla Destination · Available
Tesla Supercharger · Available
Blink · Available
- RiverSouth Garage18 ports
Flash · Available
What kind of charging does Ladera Bend Building 3 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Texas average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Ladera Bend Building 3 compare with other stations in Austin?
Austin has 725 charging stations in the DOE registry with 1,961 ports, the most of 424 cities and towns in Texas. Ladera Bend Building 3 accounts for under 1% of the charging ports in Austin. ChargePoint runs 583 stations in Austin. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.
Who operates Ladera Bend Building 3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,882 of those stations are in Texas, 45% of the state's 4,155.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 12, 2020, one of 191 stations in Texas with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Ladera Bend Building 3 have?
Ladera Bend Building 3 has 2 charging ports: 2 Level 2.
Does Ladera Bend Building 3 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Ladera Bend Building 3 have?
Ladera Bend Building 3 has J1772 connectors.
Is Ladera Bend Building 3 open to the public?
Yes. Ladera Bend Building 3 is listed with public access, and its status is available.
Where is Ladera Bend Building 3?
Ladera Bend Building 3 is at 7300 Ranch Rd 2222, Austin, TX 78730. Its coordinates are 30.37410, -97.80289.
More EV charging around Austin
Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 162616, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ladera Bend Building 3, Austin, TX (AFDC station 162616)”, https://chargecensus.com/stations/texas/ladera-bend-building-3-162616 (data as of October 12, 2026).