ChargeCensus

Cracker Barrel

Available

EV charging station in Desoto, Texas on the EVgo network — 1 DC fast · 1 Level 2. US DOE AFDC station 228191.

At a glance

Cracker Barrel is a public EV charging station at 1421 N Interstate 35 E in Desoto, Texas, on the EVgo network. It has 2 charging ports (1 DC fast · 1 Level 2) with CHAdeMO, J1772 and CCS connectors. The US DOE registry lists it as available, open since Mar 7, 2018.

Total ports
2
DC fast
1
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID228191
NetworkEVgo
StatusAvailable (E)
AccessPublic
Open dateMar 7, 2018
Last updated at sourceOct 11, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • J1772 — The standard Level 1/2 AC connector.
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

EVgo

Operates 1,220 stations in the DOE registry — view the full network →

Location

Address
1421 N Interstate 35 E
City
Desoto
State
Texas
ZIP
75115
Coordinates
32.61786, -96.82380

Within ~15 km

Nearby charging

What kind of charging does Cracker Barrel offer?

Of its 2 ports, 1 is DC fast and 1 is Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Texas average of 3.5 ports per station. The registry lists 3 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.

How does Cracker Barrel compare with other stations in Desoto?

Desoto has 2 charging stations in the DOE registry with 4 ports. Cracker Barrel accounts for 50% of the charging ports in Desoto. It is the only EVgo station in Desoto. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.

Who operates Cracker Barrel?

DC fast-focused urban charging network. EVgo operates 1,220 stations in the registry across 48 states, with 5,381 DC fast and 120 Level 2 ports in total. 92 of those stations are in Texas, 2% of the state's 4,155.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 7, 2018, one of 110 stations in Texas with a 2018 open date. The station's record was last updated at the source on Oct 11, 2026.

Frequently asked questions

How many chargers does Cracker Barrel have?

Cracker Barrel has 2 charging ports: 1 DC fast · 1 Level 2.

Does Cracker Barrel have DC fast charging?

Yes. The registry lists 1 DC fast port at Cracker Barrel, with CHAdeMO and CCS connectors.

What connectors does Cracker Barrel have?

Cracker Barrel has CHAdeMO, J1772 and CCS connectors.

Is Cracker Barrel open to the public?

Yes. Cracker Barrel is listed with public access, and its status is available.

Where is Cracker Barrel?

Cracker Barrel is at 1421 N Interstate 35 E, Desoto, TX 75115. Its coordinates are 32.61786, -96.82380.

More EV charging around Desoto

Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 228191, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Cracker Barrel, Desoto, TX (AFDC station 228191)”, https://chargecensus.com/stations/texas/cracker-barrel-228191 (data as of October 12, 2026).