Coa Fleet Marsh Yard 1
AvailableEV charging station in Austin, Texas on the ChargePoint network — 1 DC fast. US DOE AFDC station 466093.
At a glance
Coa Fleet Marsh Yard 1 is a public EV charging station at 1400 Airport Commerce Dr in Austin, Texas, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Aug 14, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 466093 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 14, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- RESI EV Chargers86 ports
Blink · Available
Tesla Destination · Available
Tesla Supercharger · Available
- RiverSouth Garage18 ports
Flash · Available
- CBRE - Innovation Tower17 ports
Abm · Available
Tesla Supercharger · Available
What kind of charging does Coa Fleet Marsh Yard 1 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 71% below the Texas average of 3.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Coa Fleet Marsh Yard 1 compare with other stations in Austin?
Austin has 725 charging stations in the DOE registry with 1,961 ports, the most of 424 cities and towns in Texas. Coa Fleet Marsh Yard 1 accounts for under 1% of the charging ports in Austin. ChargePoint runs 583 stations in Austin. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.
Who operates Coa Fleet Marsh Yard 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,882 of those stations are in Texas, 45% of the state's 4,155.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 14, 2026, one of 379 stations in Texas with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Coa Fleet Marsh Yard 1 have?
Coa Fleet Marsh Yard 1 has 1 charging port: 1 DC fast.
Does Coa Fleet Marsh Yard 1 have DC fast charging?
Yes. The registry lists 1 DC fast port at Coa Fleet Marsh Yard 1, with CHAdeMO and CCS connectors.
What connectors does Coa Fleet Marsh Yard 1 have?
Coa Fleet Marsh Yard 1 has CHAdeMO and CCS connectors.
Is Coa Fleet Marsh Yard 1 open to the public?
Yes. Coa Fleet Marsh Yard 1 is listed with public access, and its status is available.
Where is Coa Fleet Marsh Yard 1?
Coa Fleet Marsh Yard 1 is at 1400 Airport Commerce Dr, Austin, TX 78741. Its coordinates are 30.22609, -97.68797.
More EV charging around Austin
Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 466093, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Coa Fleet Marsh Yard 1, Austin, TX (AFDC station 466093)”, https://chargecensus.com/stations/texas/coa-fleet-marsh-yard-1-466093 (data as of October 12, 2026).