ChargeCensus

Building 1 and 2

Available

EV charging station in Houston, Texas on the Blink network — 4 Level 2. US DOE AFDC station 460949.

At a glance

Building 1 and 2 is a public EV charging station at 700 West Cavalcade Street in Houston, Texas, on the Blink network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 11, 2026.

Total ports
4
DC fast
0
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID460949
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateJun 11, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
700 West Cavalcade Street
State
Texas
ZIP
77009
Coordinates
29.80429, -95.38008

Within ~15 km

Nearby charging

What kind of charging does Building 1 and 2 offer?

Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 16% above the Texas average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Building 1 and 2 compare with other stations in Houston?

Houston has 440 charging stations in the DOE registry with 1,697 ports, the 2nd-most of 424 cities and towns in Texas. Building 1 and 2 accounts for under 1% of the charging ports in Houston. Blink runs 65 stations in Houston. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.

Who operates Building 1 and 2?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 410 of those stations are in Texas, 10% of the state's 4,155.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 11, 2026, one of 379 stations in Texas with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Building 1 and 2 have?

Building 1 and 2 has 4 charging ports: 4 Level 2.

Does Building 1 and 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 4 ports are all Level 2.

What connectors does Building 1 and 2 have?

Building 1 and 2 has J1772 connectors.

Is Building 1 and 2 open to the public?

Yes. Building 1 and 2 is listed with public access, and its status is available.

Where is Building 1 and 2?

Building 1 and 2 is at 700 West Cavalcade Street, Houston, TX 77009. Its coordinates are 29.80429, -95.38008.

More EV charging around Houston

Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 460949, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Building 1 and 2, Houston, TX (AFDC station 460949)”, https://chargecensus.com/stations/texas/building-1-and-2-460949 (data as of October 12, 2026).