ChargeCensus

7600- Base01 Level 1

Available

EV charging station in San Antonio, Texas on the ChargePoint network — 2 Level 2. US DOE AFDC station 311567.

At a glance

7600- Base01 Level 1 is a public EV charging station at 7600 Broadway in San Antonio, Texas, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 26, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID311567
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateSep 26, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
7600 Broadway
State
Texas
ZIP
78209
Coordinates
29.49893, -98.46568

Within ~15 km

Nearby charging

What kind of charging does 7600- Base01 Level 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Texas average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does 7600- Base01 Level 1 compare with other stations in San Antonio?

San Antonio has 242 charging stations in the DOE registry with 729 ports, the 4th-most of 424 cities and towns in Texas. 7600- Base01 Level 1 accounts for under 1% of the charging ports in San Antonio. ChargePoint runs 124 stations in San Antonio. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.

Who operates 7600- Base01 Level 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,882 of those stations are in Texas, 45% of the state's 4,155.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 26, 2023, one of 589 stations in Texas with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does 7600- Base01 Level 1 have?

7600- Base01 Level 1 has 2 charging ports: 2 Level 2.

Does 7600- Base01 Level 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does 7600- Base01 Level 1 have?

7600- Base01 Level 1 has J1772 connectors.

Is 7600- Base01 Level 1 open to the public?

Yes. 7600- Base01 Level 1 is listed with public access, and its status is available.

Where is 7600- Base01 Level 1?

7600- Base01 Level 1 is at 7600 Broadway, San Antonio, TX 78209. Its coordinates are 29.49893, -98.46568.

More EV charging around San Antonio

Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 311567, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “7600- Base01 Level 1, San Antonio, TX (AFDC station 311567)”, https://chargecensus.com/stations/texas/7600-base01-level-1-311567 (data as of October 12, 2026).