ChargeCensus

[304095] STRR Cedar Park

Available

EV charging station in Cedar Park, Texas on the Blink network — 2 Level 2. US DOE AFDC station 218235.

At a glance

[304095] STRR Cedar Park is a public EV charging station at 3120 E Whitestone Blvd in Cedar Park, Texas, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 23, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID218235
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateMar 23, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
3120 E Whitestone Blvd
State
Texas
ZIP
78613
Coordinates
30.53474, -97.78066

Within ~15 km

Nearby charging

What kind of charging does [304095] STRR Cedar Park offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Texas average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”.

How does [304095] STRR Cedar Park compare with other stations in Cedar Park?

Cedar Park has 24 charging stations in the DOE registry with 75 ports, the 25th-most of 424 cities and towns in Texas. [304095] STRR Cedar Park accounts for 3% of the charging ports in Cedar Park. Blink runs 2 stations in Cedar Park. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.

Who operates [304095] STRR Cedar Park?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 410 of those stations are in Texas, 10% of the state's 4,155.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 23, 2022, one of 558 stations in Texas with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does [304095] STRR Cedar Park have?

[304095] STRR Cedar Park has 2 charging ports: 2 Level 2.

Does [304095] STRR Cedar Park have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does [304095] STRR Cedar Park have?

[304095] STRR Cedar Park has J1772 connectors.

Is charging at [304095] STRR Cedar Park free?

Pricing as reported to the DOE registry: Free.

Is [304095] STRR Cedar Park open to the public?

Yes. [304095] STRR Cedar Park is listed with public access, and its status is available.

Where is [304095] STRR Cedar Park?

[304095] STRR Cedar Park is at 3120 E Whitestone Blvd, Cedar Park, TX 78613. Its coordinates are 30.53474, -97.78066.

More EV charging around Cedar Park

Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 218235, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “[304095] STRR Cedar Park, Cedar Park, TX (AFDC station 218235)”, https://chargecensus.com/stations/texas/304095-strr-cedar-park-218235 (data as of October 12, 2026).