2007 S Hwy 77
AvailableEV charging station in Kingsville, Texas on the EV Connect network — 2 DC fast. US DOE AFDC station 331260.
At a glance
2007 S Hwy 77 is a public EV charging station at 2007 S Hwy 77 in Kingsville, Texas, on the EV Connect network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Mar 28, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 331260 |
| Network | EV Connect |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 28, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2007 S Hwy 77
- City
- Kingsville
- State
- Texas
- ZIP
- 78363
- Coordinates
- 27.49798, -97.84410
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
Non-networked · Available
Non-networked · Available
Non-networked · Available
- 2151 US-772 ports
EV Connect · Temporarily unavailable
What kind of charging does 2007 S Hwy 77 offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 42% below the Texas average of 3.5 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does 2007 S Hwy 77 compare with other stations in Kingsville?
Kingsville has 7 charging stations in the DOE registry with 35 ports. 2007 S Hwy 77 accounts for 6% of the charging ports in Kingsville. EV Connect runs 2 stations in Kingsville. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.
Who operates 2007 S Hwy 77?
EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 75 of those stations are in Texas, 2% of the state's 4,155.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 28, 2024, one of 715 stations in Texas with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does 2007 S Hwy 77 have?
2007 S Hwy 77 has 2 charging ports: 2 DC fast.
Does 2007 S Hwy 77 have DC fast charging?
Yes. The registry lists 2 DC fast ports at 2007 S Hwy 77, with CCS connectors.
What connectors does 2007 S Hwy 77 have?
2007 S Hwy 77 has CCS connectors.
Is 2007 S Hwy 77 open to the public?
Yes. 2007 S Hwy 77 is listed with public access, and its status is available.
Where is 2007 S Hwy 77?
2007 S Hwy 77 is at 2007 S Hwy 77, Kingsville, TX 78363. Its coordinates are 27.49798, -97.84410.
More EV charging around Kingsville
Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 331260, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “2007 S Hwy 77, Kingsville, TX (AFDC station 331260)”, https://chargecensus.com/stations/texas/2007-s-hwy-77-331260 (data as of October 12, 2026).