Winchester Transimission Substation
AvailableEV charging station in Winchester, Tennessee, not on a charging network — 2 Level 2 · 1 Level 1. US DOE AFDC station 445299.
At a glance
Winchester Transimission Substation is a private EV charging station at 734 AEDC Rd in Winchester, Tennessee, not attached to a charging network. It has 3 charging ports (2 Level 2 · 1 Level 1) with NEMA 14-50 and NEMA 5-20 connectors. The US DOE registry lists it as available, open since Aug 5, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 445299 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Private |
| Facility | Federal government |
| Open date | Aug 5, 2025 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- NEMA 14-50 — 240V outlet (RV-style plug).
- NEMA 5-20 — 20A 120V wall outlet.
Pricing: not listed in the DOE registry.
Location
- Address
- 734 AEDC Rd
- City
- Winchester
- State
- Tennessee
- ZIP
- 37398
- Coordinates
- 35.22785, -86.09730
Within ~15 km
Nearby charging
Tesla Destination · Available
ChargePoint · Available
ChargePoint · Available
What kind of charging does Winchester Transimission Substation offer?
Of its 3 ports, 2 are Level 2 and 1 is Level 1. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. Level 1 ports are standard 120-volt outlets, the slowest way to charge. That is roughly in line with the Tennessee average of 2.8 ports per station. The registry lists 2 connector types: NEMA 14-50, 240V outlet (RV-style plug); NEMA 5-20, 20A 120V wall outlet. The site is listed as a federal government location. It is flagged as workplace charging.
How does Winchester Transimission Substation compare with other stations in Winchester?
Winchester has 3 charging stations in the DOE registry with 11 ports. Winchester Transimission Substation accounts for 27% of the charging ports in Winchester. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.
Who operates Winchester Transimission Substation?
Winchester Transimission Substation is listed as non-networked: its chargers are not run through a charging-network account. Tennessee has 171 non-networked stations, 13% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Aug 5, 2025, one of 264 stations in Tennessee with a 2025 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does Winchester Transimission Substation have?
Winchester Transimission Substation has 3 charging ports: 2 Level 2 · 1 Level 1.
Does Winchester Transimission Substation have DC fast charging?
No. The registry lists no DC fast ports here; its 3 ports are 2 Level 2 · 1 Level 1.
What connectors does Winchester Transimission Substation have?
Winchester Transimission Substation has NEMA 14-50 and NEMA 5-20 connectors.
Is Winchester Transimission Substation open to the public?
No. Winchester Transimission Substation is listed with private access.
Where is Winchester Transimission Substation?
Winchester Transimission Substation is at 734 AEDC Rd, Winchester, TN 37398. Its coordinates are 35.22785, -86.09730.
More EV charging around Winchester
Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 445299, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Winchester Transimission Substation, Winchester, TN (AFDC station 445299)”, https://chargecensus.com/stations/tennessee/winchester-transimission-substation-445299 (data as of October 12, 2026).