ChargeCensus

Uos Sewanee Inn L

Available

EV charging station in Sewanee, Tennessee on the ChargePoint network — 2 Level 2. US DOE AFDC station 460856.

At a glance

Uos Sewanee Inn L is a public EV charging station at 1235 University Ave in Sewanee, Tennessee, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 10, 2026.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 4 nearby

Station record

DOE registry record

FieldValue
AFDC station ID460856
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJun 10, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1235 University Ave
City
Sewanee
ZIP
37375
Coordinates
35.20936, -85.91499

Within ~15 km

Nearby charging

What kind of charging does Uos Sewanee Inn L offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Tennessee average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Uos Sewanee Inn L compare with other stations in Sewanee?

Sewanee has 3 charging stations in the DOE registry with 6 ports. Uos Sewanee Inn L accounts for 33% of the charging ports in Sewanee. ChargePoint runs 3 stations in Sewanee. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.

Who operates Uos Sewanee Inn L?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 616 of those stations are in Tennessee, 48% of the state's 1,273.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 10, 2026, one of 86 stations in Tennessee with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Uos Sewanee Inn L have?

Uos Sewanee Inn L has 2 charging ports: 2 Level 2.

Does Uos Sewanee Inn L have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Uos Sewanee Inn L have?

Uos Sewanee Inn L has J1772 connectors.

Is Uos Sewanee Inn L open to the public?

Yes. Uos Sewanee Inn L is listed with public access, and its status is available.

Where is Uos Sewanee Inn L?

Uos Sewanee Inn L is at 1235 University Ave, Sewanee, TN 37375. Its coordinates are 35.20936, -85.91499.

More EV charging around Sewanee

Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 460856, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Uos Sewanee Inn L, Sewanee, TN (AFDC station 460856)”, https://chargecensus.com/stations/tennessee/uos-sewanee-inn-l-460856 (data as of October 12, 2026).