ChargeCensus

The Post 1 Station 1

Available

EV charging station in Gallatin, Tennessee on the ChargePoint network — 2 Level 2. US DOE AFDC station 466712.

At a glance

The Post 1 Station 1 is a public EV charging station at 995 Kennesaw Boulevard in Gallatin, Tennessee, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 26, 2026.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID466712
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateAug 26, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
995 Kennesaw Boulevard
ZIP
37066
Coordinates
36.35531, -86.50867

Within ~15 km

Nearby charging

What kind of charging does The Post 1 Station 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Tennessee average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does The Post 1 Station 1 compare with other stations in Gallatin?

Gallatin has 11 charging stations in the DOE registry with 27 ports, the 18th-most of 164 cities and towns in Tennessee. The Post 1 Station 1 accounts for 7% of the charging ports in Gallatin. ChargePoint runs 5 stations in Gallatin. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.

Who operates The Post 1 Station 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 616 of those stations are in Tennessee, 48% of the state's 1,273.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 26, 2026, one of 86 stations in Tennessee with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does The Post 1 Station 1 have?

The Post 1 Station 1 has 2 charging ports: 2 Level 2.

Does The Post 1 Station 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does The Post 1 Station 1 have?

The Post 1 Station 1 has J1772 connectors.

Is The Post 1 Station 1 open to the public?

Yes. The Post 1 Station 1 is listed with public access, and its status is available.

Where is The Post 1 Station 1?

The Post 1 Station 1 is at 995 Kennesaw Boulevard, Gallatin, TN 37066. Its coordinates are 36.35531, -86.50867.

More EV charging around Gallatin

Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 466712, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “The Post 1 Station 1, Gallatin, TN (AFDC station 466712)”, https://chargecensus.com/stations/tennessee/the-post-1-station-1-466712 (data as of October 12, 2026).