ChargeCensus

Stemc Station 2 (R) A

Available

EV charging station in Atoka, Tennessee on the ChargePoint network — 1 DC fast. US DOE AFDC station 329015.

At a glance

Stemc Station 2 (R) A is a public EV charging station at 10772 U.S. 51 in Atoka, Tennessee, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Feb 23, 2024.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID329015
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateFeb 23, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.
  • NACS (Tesla) — The North American Charging Standard connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
10772 U.S. 51
City
Atoka
ZIP
38004
Coordinates
35.44962, -89.78064

Within ~15 km

Nearby charging

What kind of charging does Stemc Station 2 (R) A offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 64% below the Tennessee average of 2.8 ports per station. The registry lists 2 connector types: CCS, Combined Charging System — the J1772-based DC fast connector; NACS (Tesla), the North American Charging Standard connector.

How does Stemc Station 2 (R) A compare with other stations in Atoka?

Atoka has 2 charging stations in the DOE registry with 2 ports. Stemc Station 2 (R) A accounts for 50% of the charging ports in Atoka. ChargePoint runs 2 stations in Atoka. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.

Who operates Stemc Station 2 (R) A?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 616 of those stations are in Tennessee, 48% of the state's 1,273.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 23, 2024, one of 166 stations in Tennessee with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Stemc Station 2 (R) A have?

Stemc Station 2 (R) A has 1 charging port: 1 DC fast.

Does Stemc Station 2 (R) A have DC fast charging?

Yes. The registry lists 1 DC fast port at Stemc Station 2 (R) A, with CCS and NACS (Tesla) connectors.

What connectors does Stemc Station 2 (R) A have?

Stemc Station 2 (R) A has CCS and NACS (Tesla) connectors.

Is Stemc Station 2 (R) A open to the public?

Yes. Stemc Station 2 (R) A is listed with public access, and its status is available.

Where is Stemc Station 2 (R) A?

Stemc Station 2 (R) A is at 10772 U.S. 51, Atoka, TN 38004. Its coordinates are 35.44962, -89.78064.

More EV charging around Atoka

Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 329015, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Stemc Station 2 (R) A, Atoka, TN (AFDC station 329015)”, https://chargecensus.com/stations/tennessee/stemc-station-2-r-a-329015 (data as of October 12, 2026).