ChargeCensus

Rocky Top Ford

Available

EV charging station in Sevierville, Tennessee on the Red E network — 2 DC fast. US DOE AFDC station 396956.

At a glance

Rocky Top Ford is a public EV charging station at 850 Winfield Dunn Pkwy in Sevierville, Tennessee, on the Red E network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Sep 23, 2024.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID396956
NetworkRed E
StatusAvailable (E)
AccessPublic
FacilityPublic site
Open dateSep 23, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Red E

Operates 1,105 stations in the DOE registry — view the full network →

Location

Address
850 Winfield Dunn Pkwy
City
Sevierville
ZIP
37876
Coordinates
35.88658, -83.57530

Within ~15 km

Nearby charging

What kind of charging does Rocky Top Ford offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 29% below the Tennessee average of 2.8 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector. The site is listed as a public site location.

How does Rocky Top Ford compare with other stations in Sevierville?

Sevierville has 8 charging stations in the DOE registry with 16 ports. Rocky Top Ford accounts for 13% of the charging ports in Sevierville. It is the only Red E station in Sevierville. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.

Who operates Rocky Top Ford?

Red E operates 1,105 stations in the registry across 47 states, with 2,240 DC fast and 2,633 Level 2 ports in total. 1 of those stations are in Tennessee, under 1% of the state's 1,273.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 23, 2024, one of 166 stations in Tennessee with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Rocky Top Ford have?

Rocky Top Ford has 2 charging ports: 2 DC fast.

Does Rocky Top Ford have DC fast charging?

Yes. The registry lists 2 DC fast ports at Rocky Top Ford, with CCS connectors.

What connectors does Rocky Top Ford have?

Rocky Top Ford has CCS connectors.

Is Rocky Top Ford open to the public?

Yes. Rocky Top Ford is listed with public access, and its status is available.

Where is Rocky Top Ford?

Rocky Top Ford is at 850 Winfield Dunn Pkwy, Sevierville, TN 37876. Its coordinates are 35.88658, -83.57530.

More EV charging around Sevierville

Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 396956, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Rocky Top Ford, Sevierville, TN (AFDC station 396956)”, https://chargecensus.com/stations/tennessee/rocky-top-ford-396956 (data as of October 12, 2026).