Roberts Nissan
AvailableEV charging station in Manchester, Tennessee, not on a charging network — 1 Level 2. US DOE AFDC station 39816.
At a glance
Roberts Nissan is a public EV charging station at 2747 Hillsboro Hwy in Manchester, Tennessee, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 1, 2019.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 39816 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Car dealership |
| Open date | May 1, 2019 |
| Last updated at source | Feb 12, 2025 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 2747 Hillsboro Hwy
- City
- Manchester
- State
- Tennessee
- ZIP
- 37355
- Coordinates
- 35.45470, -86.04180
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Electrify America · Available
- Roberts Nissan3 ports
Non-networked · Available
- John Roberts Ct4020-12 ports
ChargePoint · Available
- FPAC - USDA Service Center2 ports
Non-networked · Available
What kind of charging does Roberts Nissan offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 64% below the Tennessee average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a car dealership location.
How does Roberts Nissan compare with other stations in Manchester?
Manchester has 6 charging stations in the DOE registry with 22 ports. Roberts Nissan accounts for 5% of the charging ports in Manchester. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.
Who operates Roberts Nissan?
Roberts Nissan is listed as non-networked: its chargers are not run through a charging-network account. Tennessee has 171 non-networked stations, 13% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 1, 2019, one of 48 stations in Tennessee with a 2019 open date. The station's record was last updated at the source on Feb 12, 2025.
Frequently asked questions
How many chargers does Roberts Nissan have?
Roberts Nissan has 1 charging port: 1 Level 2.
Does Roberts Nissan have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Roberts Nissan have?
Roberts Nissan has J1772 connectors.
Is charging at Roberts Nissan free?
Pricing as reported to the DOE registry: Free.
Is Roberts Nissan open to the public?
Yes. Roberts Nissan is listed with public access, and its status is available.
Where is Roberts Nissan?
Roberts Nissan is at 2747 Hillsboro Hwy, Manchester, TN 37355. Its coordinates are 35.45470, -86.04180.
More EV charging around Manchester
Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 39816, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Roberts Nissan, Manchester, TN (AFDC station 39816)”, https://chargecensus.com/stations/tennessee/roberts-nissan-39816 (data as of October 12, 2026).