ChargeCensus

Reelfoot Lake State Park

Available

EV charging station in Tiptonville, Tennessee on the Rivian Waypoints network — 2 Level 2. US DOE AFDC station 422847.

At a glance

Reelfoot Lake State Park is a public EV charging station at 2595 TN-21 in Tiptonville, Tennessee, on the Rivian Waypoints network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 24, 2025.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
Location

Station record

DOE registry record

FieldValue
AFDC station ID422847
NetworkRivian Waypoints
StatusAvailable (E)
AccessPublic
FacilityPublic site
Open dateSep 24, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Rivian Waypoints

Operates 207 stations in the DOE registry — view the full network →

Location

Address
2595 TN-21
City
Tiptonville
ZIP
38079
Coordinates
36.36382, -89.43260

Within ~15 km

Nearby charging

No other registered stations within ~15 km.

What kind of charging does Reelfoot Lake State Park offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Tennessee average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a public site location.

How does Reelfoot Lake State Park compare with other stations in Tiptonville?

Tiptonville has 1 charging station in the DOE registry with 2 ports. It is the only Rivian Waypoints station in Tiptonville. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.

Who operates Reelfoot Lake State Park?

Rivian Waypoints operates 207 stations in the registry across 28 states, with 540 Level 2 ports in total. 50 of those stations are in Tennessee, 4% of the state's 1,273.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 24, 2025, one of 264 stations in Tennessee with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Reelfoot Lake State Park have?

Reelfoot Lake State Park has 2 charging ports: 2 Level 2.

Does Reelfoot Lake State Park have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Reelfoot Lake State Park have?

Reelfoot Lake State Park has J1772 connectors.

Is Reelfoot Lake State Park open to the public?

Yes. Reelfoot Lake State Park is listed with public access, and its status is available.

Where is Reelfoot Lake State Park?

Reelfoot Lake State Park is at 2595 TN-21, Tiptonville, TN 38079. Its coordinates are 36.36382, -89.43260.

More EV charging around Tiptonville

Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 422847, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Reelfoot Lake State Park, Tiptonville, TN (AFDC station 422847)”, https://chargecensus.com/stations/tennessee/reelfoot-lake-state-park-422847 (data as of October 12, 2026).