Nes Power Serra 2
AvailableEV charging station in Nashville, Tennessee on the ChargePoint network — 1 DC fast. US DOE AFDC station 312334.
At a glance
Nes Power Serra 2 is a public EV charging station at 2340 Gallatin Pike N in Nashville, Tennessee, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Oct 5, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 312334 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 5, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
- NACS (Tesla) — The North American Charging Standard connector.
Pricing: not listed in the DOE registry.
Location
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Wayward Nashville12 ports
Blink · Available
Tesla Supercharger · Available
Electrify America · Available
- SoBro Tower Garage8 ports
Flash · Available
Tesla Supercharger · Available
What kind of charging does Nes Power Serra 2 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 64% below the Tennessee average of 2.8 ports per station. The registry lists 2 connector types: CCS, Combined Charging System — the J1772-based DC fast connector; NACS (Tesla), the North American Charging Standard connector.
How does Nes Power Serra 2 compare with other stations in Nashville?
Nashville has 363 charging stations in the DOE registry with 973 ports, the most of 164 cities and towns in Tennessee. Nes Power Serra 2 accounts for under 1% of the charging ports in Nashville. ChargePoint runs 261 stations in Nashville. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.
Who operates Nes Power Serra 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 616 of those stations are in Tennessee, 48% of the state's 1,273.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 5, 2023, one of 186 stations in Tennessee with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Nes Power Serra 2 have?
Nes Power Serra 2 has 1 charging port: 1 DC fast.
Does Nes Power Serra 2 have DC fast charging?
Yes. The registry lists 1 DC fast port at Nes Power Serra 2, with CCS and NACS (Tesla) connectors.
What connectors does Nes Power Serra 2 have?
Nes Power Serra 2 has CCS and NACS (Tesla) connectors.
Is Nes Power Serra 2 open to the public?
Yes. Nes Power Serra 2 is listed with public access, and its status is available.
Where is Nes Power Serra 2?
Nes Power Serra 2 is at 2340 Gallatin Pike N, Nashville, TN 37115. Its coordinates are 36.30850, -86.68309.
More EV charging around Nashville
Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 312334, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Nes Power Serra 2, Nashville, TN (AFDC station 312334)”, https://chargecensus.com/stations/tennessee/nes-power-serra-2-312334 (data as of October 12, 2026).