Music City Ctr P-2 Right
AvailableEV charging station in Nashville, Tennessee on the ChargePoint network — 2 Level 2. US DOE AFDC station 307576.
At a glance
Music City Ctr P-2 Right is a public EV charging station at 201 Rep. John Lewis Way S in Nashville, Tennessee, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 22, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 307576 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 22, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
Within ~15 km
Nearby charging
- Nashville Zoo36 ports
Loop · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Non-networked · Available
What kind of charging does Music City Ctr P-2 Right offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Tennessee average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Music City Ctr P-2 Right compare with other stations in Nashville?
Nashville has 363 charging stations in the DOE registry with 973 ports, the most of 164 cities and towns in Tennessee. Music City Ctr P-2 Right accounts for under 1% of the charging ports in Nashville. ChargePoint runs 261 stations in Nashville. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.
Who operates Music City Ctr P-2 Right?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 616 of those stations are in Tennessee, 48% of the state's 1,273.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 22, 2023, one of 186 stations in Tennessee with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Music City Ctr P-2 Right have?
Music City Ctr P-2 Right has 2 charging ports: 2 Level 2.
Does Music City Ctr P-2 Right have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Music City Ctr P-2 Right have?
Music City Ctr P-2 Right has J1772 connectors.
Is Music City Ctr P-2 Right open to the public?
Yes. Music City Ctr P-2 Right is listed with public access, and its status is available.
Where is Music City Ctr P-2 Right?
Music City Ctr P-2 Right is at 201 Rep. John Lewis Way S, Nashville, TN 37203. Its coordinates are 36.15723, -86.77730.
More EV charging around Nashville
Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 307576, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Music City Ctr P-2 Right, Nashville, TN (AFDC station 307576)”, https://chargecensus.com/stations/tennessee/music-city-ctr-p-2-right-307576 (data as of October 12, 2026).