ChargeCensus

Mu Station 2 (M)

Available

EV charging station in Morristown, Tennessee on the ChargePoint network — 1 DC fast. US DOE AFDC station 390072.

At a glance

Mu Station 2 (M) is a public EV charging station at 5290 South Davy Crockett Parkway in Morristown, Tennessee, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Apr 17, 2025.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID390072
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 17, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
5290 South Davy Crockett Parkway
ZIP
37813
Coordinates
36.14304, -83.28024

Within ~15 km

Nearby charging

What kind of charging does Mu Station 2 (M) offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 64% below the Tennessee average of 2.8 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Mu Station 2 (M) compare with other stations in Morristown?

Morristown has 11 charging stations in the DOE registry with 15 ports, the 20th-most of 164 cities and towns in Tennessee. Mu Station 2 (M) accounts for 7% of the charging ports in Morristown. ChargePoint runs 9 stations in Morristown. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.

Who operates Mu Station 2 (M)?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 616 of those stations are in Tennessee, 48% of the state's 1,273.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 17, 2025, one of 264 stations in Tennessee with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Mu Station 2 (M) have?

Mu Station 2 (M) has 1 charging port: 1 DC fast.

Does Mu Station 2 (M) have DC fast charging?

Yes. The registry lists 1 DC fast port at Mu Station 2 (M), with CCS connectors.

What connectors does Mu Station 2 (M) have?

Mu Station 2 (M) has CCS connectors.

Is Mu Station 2 (M) open to the public?

Yes. Mu Station 2 (M) is listed with public access, and its status is available.

Where is Mu Station 2 (M)?

Mu Station 2 (M) is at 5290 South Davy Crockett Parkway, Morristown, TN 37813. Its coordinates are 36.14304, -83.28024.

More EV charging around Morristown

Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 390072, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Mu Station 2 (M), Morristown, TN (AFDC station 390072)”, https://chargecensus.com/stations/tennessee/mu-station-2-m-390072 (data as of October 12, 2026).