ChargeCensus

Main Location

Available

EV charging station in Nashville, Tennessee on the Blink network — 8 Level 2. US DOE AFDC station 312022.

At a glance

Main Location is a public EV charging station at 501 5th Ave. South in Nashville, Tennessee, on the Blink network. It has 8 charging ports (8 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 29, 2023.

Total ports
8
DC fast
0
Level 2
8
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID312022
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateSep 29, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
501 5th Ave. South
ZIP
37203
Coordinates
36.15489, -86.77541

Within ~15 km

Nearby charging

What kind of charging does Main Location offer?

Of its 8 ports, 8 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.8 times the Tennessee average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Main Location compare with other stations in Nashville?

Nashville has 363 charging stations in the DOE registry with 973 ports, the most of 164 cities and towns in Tennessee. Main Location accounts for under 1% of the charging ports in Nashville. Blink runs 36 stations in Nashville. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.

Who operates Main Location?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 186 of those stations are in Tennessee, 15% of the state's 1,273.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 29, 2023, one of 186 stations in Tennessee with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Main Location have?

Main Location has 8 charging ports: 8 Level 2.

Does Main Location have DC fast charging?

No. The registry lists no DC fast ports here; its 8 ports are all Level 2.

What connectors does Main Location have?

Main Location has J1772 connectors.

Is Main Location open to the public?

Yes. Main Location is listed with public access, and its status is available.

Where is Main Location?

Main Location is at 501 5th Ave. South, Nashville, TN 37203. Its coordinates are 36.15489, -86.77541.

More EV charging around Nashville

Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 312022, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Main Location, Nashville, TN (AFDC station 312022)”, https://chargecensus.com/stations/tennessee/main-location-312022 (data as of October 12, 2026).