Long Hunter State Park
AvailableEV charging station in Hermitage, Tennessee on the Rivian Waypoints network — 2 Level 2. US DOE AFDC station 391152.
At a glance
Long Hunter State Park is a public EV charging station at 2910 Hobson Pike in Hermitage, Tennessee, on the Rivian Waypoints network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 13, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 391152 |
| Network | Rivian Waypoints |
| Status | Available (E) |
| Access | Public |
| Facility | Public site |
| Open date | Dec 13, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2910 Hobson Pike
- City
- Hermitage
- State
- Tennessee
- ZIP
- 37076
- Coordinates
- 36.09270, -86.55581
Within ~15 km
Nearby charging
- Vintage Stonetrace24 ports
Blink · Available
Blink · Available
Tesla Supercharger · Available
Tesla Destination · Available
- Vintage Century Farm Owner8 ports
Blink · Available
Tesla Destination · Available
What kind of charging does Long Hunter State Park offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Tennessee average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a public site location.
How does Long Hunter State Park compare with other stations in Hermitage?
Hermitage has 4 charging stations in the DOE registry with 12 ports. Long Hunter State Park accounts for 17% of the charging ports in Hermitage. It is the only Rivian Waypoints station in Hermitage. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.
Who operates Long Hunter State Park?
Rivian Waypoints operates 207 stations in the registry across 28 states, with 540 Level 2 ports in total. 50 of those stations are in Tennessee, 4% of the state's 1,273.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 13, 2024, one of 166 stations in Tennessee with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Long Hunter State Park have?
Long Hunter State Park has 2 charging ports: 2 Level 2.
Does Long Hunter State Park have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Long Hunter State Park have?
Long Hunter State Park has J1772 connectors.
Is Long Hunter State Park open to the public?
Yes. Long Hunter State Park is listed with public access, and its status is available.
Where is Long Hunter State Park?
Long Hunter State Park is at 2910 Hobson Pike, Hermitage, TN 37076. Its coordinates are 36.09270, -86.55581.
More EV charging around Hermitage
Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 391152, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Long Hunter State Park, Hermitage, TN (AFDC station 391152)”, https://chargecensus.com/stations/tennessee/long-hunter-state-park-391152 (data as of October 12, 2026).