Indian Mountain State Park
AvailableEV charging station in Jellico, Tennessee on the Rivian Waypoints network — 2 Level 2. US DOE AFDC station 391115.
At a glance
Indian Mountain State Park is a public EV charging station at 143 Indian Mountain State Park Cir in Jellico, Tennessee, on the Rivian Waypoints network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 21, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 391115 |
| Network | Rivian Waypoints |
| Status | Available (E) |
| Access | Public |
| Facility | Public site |
| Open date | Dec 21, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 143 Indian Mountain State Park Cir
- City
- Jellico
- State
- Tennessee
- ZIP
- 37762
- Coordinates
- 36.58466, -84.14157
Within ~15 km
Nearby charging
Electrify America · Available
- Pilot Travel Center 4374 ports
EVgo · Available
What kind of charging does Indian Mountain State Park offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Tennessee average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a public site location.
How does Indian Mountain State Park compare with other stations in Jellico?
Jellico has 1 charging station in the DOE registry with 2 ports. It is the only Rivian Waypoints station in Jellico. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.
Who operates Indian Mountain State Park?
Rivian Waypoints operates 207 stations in the registry across 28 states, with 540 Level 2 ports in total. 50 of those stations are in Tennessee, 4% of the state's 1,273.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 21, 2022, one of 107 stations in Tennessee with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Indian Mountain State Park have?
Indian Mountain State Park has 2 charging ports: 2 Level 2.
Does Indian Mountain State Park have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Indian Mountain State Park have?
Indian Mountain State Park has J1772 connectors.
Is Indian Mountain State Park open to the public?
Yes. Indian Mountain State Park is listed with public access, and its status is available.
Where is Indian Mountain State Park?
Indian Mountain State Park is at 143 Indian Mountain State Park Cir, Jellico, TN 37762. Its coordinates are 36.58466, -84.14157.
More EV charging around Jellico
Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 391115, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Indian Mountain State Park, Jellico, TN (AFDC station 391115)”, https://chargecensus.com/stations/tennessee/indian-mountain-state-park-391115 (data as of October 12, 2026).