Highwoods Rtp Va Springs 2 S2 is a public EV charging station at 218 Granny White Pike in Brentwood, Tennessee, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 29, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID203123
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateDec 29, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
218 Granny White Pike
ZIP
37027
Coordinates
36.03283, -86.81613

Within ~15 km

Nearby charging

What kind of charging does Highwoods Rtp Va Springs 2 S2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Tennessee average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Highwoods Rtp Va Springs 2 S2 compare with other stations in Brentwood?

Brentwood has 36 charging stations in the DOE registry with 91 ports, the 6th-most of 164 cities and towns in Tennessee. Highwoods Rtp Va Springs 2 S2 accounts for 2% of the charging ports in Brentwood. ChargePoint runs 21 stations in Brentwood. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.

Who operates Highwoods Rtp Va Springs 2 S2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 616 of those stations are in Tennessee, 48% of the state's 1,273.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 29, 2021, one of 203 stations in Tennessee with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Highwoods Rtp Va Springs 2 S2 have?

Highwoods Rtp Va Springs 2 S2 has 2 charging ports: 2 Level 2.

Does Highwoods Rtp Va Springs 2 S2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Highwoods Rtp Va Springs 2 S2 have?

Highwoods Rtp Va Springs 2 S2 has J1772 connectors.

Is Highwoods Rtp Va Springs 2 S2 open to the public?

Yes. Highwoods Rtp Va Springs 2 S2 is listed with public access, and its status is available.

Where is Highwoods Rtp Va Springs 2 S2?

Highwoods Rtp Va Springs 2 S2 is at 218 Granny White Pike, Brentwood, TN 37027. Its coordinates are 36.03283, -86.81613.

More EV charging around Brentwood

Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 203123, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Highwoods Rtp Va Springs 2 S2, Brentwood, TN (AFDC station 203123)”, https://chargecensus.com/stations/tennessee/highwoods-rtp-va-springs-2-s2-203123 (data as of October 12, 2026).