ChargeCensus

Fpu Station 1 (L)

Available

EV charging station in Fayetteville, Tennessee on the ChargePoint network — 1 DC fast. US DOE AFDC station 331162.

At a glance

Fpu Station 1 (L) is a public EV charging station at 110 College St W in Fayetteville, Tennessee, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Mar 27, 2024.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 1 nearby

Station record

DOE registry record

FieldValue
AFDC station ID331162
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMar 27, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
110 College St W
City
Fayetteville
ZIP
37334
Coordinates
35.15203, -86.57140

Within ~15 km

Nearby charging

What kind of charging does Fpu Station 1 (L) offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 64% below the Tennessee average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Fpu Station 1 (L) compare with other stations in Fayetteville?

Fayetteville has 2 charging stations in the DOE registry with 2 ports. Fpu Station 1 (L) accounts for 50% of the charging ports in Fayetteville. ChargePoint runs 2 stations in Fayetteville. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.

Who operates Fpu Station 1 (L)?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 616 of those stations are in Tennessee, 48% of the state's 1,273.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 27, 2024, one of 166 stations in Tennessee with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Fpu Station 1 (L) have?

Fpu Station 1 (L) has 1 charging port: 1 DC fast.

Does Fpu Station 1 (L) have DC fast charging?

Yes. The registry lists 1 DC fast port at Fpu Station 1 (L), with CHAdeMO and CCS connectors.

What connectors does Fpu Station 1 (L) have?

Fpu Station 1 (L) has CHAdeMO and CCS connectors.

Is Fpu Station 1 (L) open to the public?

Yes. Fpu Station 1 (L) is listed with public access, and its status is available.

Where is Fpu Station 1 (L)?

Fpu Station 1 (L) is at 110 College St W, Fayetteville, TN 37334. Its coordinates are 35.15203, -86.57140.

More EV charging around Fayetteville

Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 331162, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Fpu Station 1 (L), Fayetteville, TN (AFDC station 331162)”, https://chargecensus.com/stations/tennessee/fpu-station-1-l-331162 (data as of October 12, 2026).