ChargeCensus

First Tn Hra Gville Connect1

Available

EV charging station in Greeneville, Tennessee on the ChargePoint network — 1 Level 2. US DOE AFDC station 395920.

At a glance

First Tn Hra Gville Connect1 is a public EV charging station at 217 South College Street in Greeneville, Tennessee, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 20, 2025.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID395920
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 20, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
217 South College Street
ZIP
37743
Coordinates
36.16107, -82.83024

Within ~15 km

Nearby charging

What kind of charging does First Tn Hra Gville Connect1 offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 64% below the Tennessee average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does First Tn Hra Gville Connect1 compare with other stations in Greeneville?

Greeneville has 10 charging stations in the DOE registry with 13 ports, the 22nd-most of 164 cities and towns in Tennessee. First Tn Hra Gville Connect1 accounts for 8% of the charging ports in Greeneville. ChargePoint runs 7 stations in Greeneville. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.

Who operates First Tn Hra Gville Connect1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 616 of those stations are in Tennessee, 48% of the state's 1,273.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 20, 2025, one of 264 stations in Tennessee with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does First Tn Hra Gville Connect1 have?

First Tn Hra Gville Connect1 has 1 charging port: 1 Level 2.

Does First Tn Hra Gville Connect1 have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does First Tn Hra Gville Connect1 have?

First Tn Hra Gville Connect1 has J1772 connectors.

Is First Tn Hra Gville Connect1 open to the public?

Yes. First Tn Hra Gville Connect1 is listed with public access, and its status is available.

Where is First Tn Hra Gville Connect1?

First Tn Hra Gville Connect1 is at 217 South College Street, Greeneville, TN 37743. Its coordinates are 36.16107, -82.83024.

More EV charging around Greeneville

Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 395920, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “First Tn Hra Gville Connect1, Greeneville, TN (AFDC station 395920)”, https://chargecensus.com/stations/tennessee/first-tn-hra-gville-connect1-395920 (data as of October 12, 2026).