ChargeCensus

Electrical Eaton Energy Do

Available

EV charging station in Cleveland, Tennessee on the ChargePoint network — 1 Level 2. US DOE AFDC station 465297.

At a glance

Electrical Eaton Energy Do is a public EV charging station at 3990 Old Tasso Road Northeast in Cleveland, Tennessee, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 30, 2026.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID465297
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJul 30, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
3990 Old Tasso Road Northeast
City
Cleveland
ZIP
37312
Coordinates
35.17970, -84.82926

Within ~15 km

Nearby charging

What kind of charging does Electrical Eaton Energy Do offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 64% below the Tennessee average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Electrical Eaton Energy Do compare with other stations in Cleveland?

Cleveland has 8 charging stations in the DOE registry with 36 ports. Electrical Eaton Energy Do accounts for 3% of the charging ports in Cleveland. ChargePoint runs 2 stations in Cleveland. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.

Who operates Electrical Eaton Energy Do?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 616 of those stations are in Tennessee, 48% of the state's 1,273.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 30, 2026, one of 86 stations in Tennessee with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Electrical Eaton Energy Do have?

Electrical Eaton Energy Do has 1 charging port: 1 Level 2.

Does Electrical Eaton Energy Do have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Electrical Eaton Energy Do have?

Electrical Eaton Energy Do has J1772 connectors.

Is Electrical Eaton Energy Do open to the public?

Yes. Electrical Eaton Energy Do is listed with public access, and its status is available.

Where is Electrical Eaton Energy Do?

Electrical Eaton Energy Do is at 3990 Old Tasso Road Northeast, Cleveland, TN 37312. Its coordinates are 35.17970, -84.82926.

More EV charging around Cleveland

Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 465297, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Electrical Eaton Energy Do, Cleveland, TN (AFDC station 465297)”, https://chargecensus.com/stations/tennessee/electrical-eaton-energy-do-465297 (data as of October 12, 2026).