East Tennessee Nissan
AvailableEV charging station in Morristown, Tennessee, not on a charging network — 1 Level 2. US DOE AFDC station 47839.
At a glance
East Tennessee Nissan is a private EV charging station at 5496 W Andrew Johnson Hwy in Morristown, Tennessee, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 15, 2011.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 47839 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Private |
| Facility | Car dealership |
| Open date | Mar 15, 2011 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 5496 W Andrew Johnson Hwy
- City
- Morristown
- State
- Tennessee
- ZIP
- 37814
- Coordinates
- 36.18250, -83.38221
Within ~15 km
Nearby charging
- Rusty Wallace Ford4 ports
ZEF Energy · Available
- Pilot Travel Center 4124 ports
EVgo · Available
- 134 Sharon Dr2 ports
EV Connect · Available
- Aec Aec032 ports
ChargePoint · Available
- Mu Station 1 (L)2 ports
ChargePoint · Available
- Aec Aec042 ports
ChargePoint · Available
What kind of charging does East Tennessee Nissan offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 64% below the Tennessee average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a car dealership location.
How does East Tennessee Nissan compare with other stations in Morristown?
Morristown has 11 charging stations in the DOE registry with 15 ports, the 20th-most of 164 cities and towns in Tennessee. East Tennessee Nissan accounts for 7% of the charging ports in Morristown. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.
Who operates East Tennessee Nissan?
East Tennessee Nissan is listed as non-networked: its chargers are not run through a charging-network account. Tennessee has 171 non-networked stations, 13% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Mar 15, 2011, one of 35 stations in Tennessee with a 2011 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does East Tennessee Nissan have?
East Tennessee Nissan has 1 charging port: 1 Level 2.
Does East Tennessee Nissan have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does East Tennessee Nissan have?
East Tennessee Nissan has J1772 connectors.
Is charging at East Tennessee Nissan free?
Pricing as reported to the DOE registry: Free.
Is East Tennessee Nissan open to the public?
No. East Tennessee Nissan is listed with private access.
Where is East Tennessee Nissan?
East Tennessee Nissan is at 5496 W Andrew Johnson Hwy, Morristown, TN 37814. Its coordinates are 36.18250, -83.38221.
More EV charging around Morristown
Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 47839, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “East Tennessee Nissan, Morristown, TN (AFDC station 47839)”, https://chargecensus.com/stations/tennessee/east-tennessee-nissan-47839 (data as of October 12, 2026).