ChargeCensus

Camden Franklin Park

Available

EV charging station in Franklin, Tennessee on the Loop network — 4 Level 2. US DOE AFDC station 453193.

At a glance

Camden Franklin Park is a public EV charging station at 6300 Tower Cir in Franklin, Tennessee, on the Loop network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 25, 2025.

Total ports
4
DC fast
0
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID453193
NetworkLoop
StatusAvailable (E)
AccessPublic
FacilityOther
Open dateJun 25, 2025
Last updated at sourceSep 22, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Loop

Operates 1,233 stations in the DOE registry — view the full network →

Location

Address
6300 Tower Cir
ZIP
37067
Coordinates
35.93770, -86.81228

Within ~15 km

Nearby charging

What kind of charging does Camden Franklin Park offer?

Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% above the Tennessee average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a other location.

How does Camden Franklin Park compare with other stations in Franklin?

Franklin has 37 charging stations in the DOE registry with 88 ports, the 5th-most of 164 cities and towns in Tennessee. Camden Franklin Park accounts for 5% of the charging ports in Franklin. Loop runs 3 stations in Franklin. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.

Who operates Camden Franklin Park?

Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 10 of those stations are in Tennessee, under 1% of the state's 1,273.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 25, 2025, one of 264 stations in Tennessee with a 2025 open date. The station's record was last updated at the source on Sep 22, 2026.

Frequently asked questions

How many chargers does Camden Franklin Park have?

Camden Franklin Park has 4 charging ports: 4 Level 2.

Does Camden Franklin Park have DC fast charging?

No. The registry lists no DC fast ports here; its 4 ports are all Level 2.

What connectors does Camden Franklin Park have?

Camden Franklin Park has J1772 connectors.

Is Camden Franklin Park open to the public?

Yes. Camden Franklin Park is listed with public access, and its status is available.

Where is Camden Franklin Park?

Camden Franklin Park is at 6300 Tower Cir, Franklin, TN 37067. Its coordinates are 35.93770, -86.81228.

More EV charging around Franklin

Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 453193, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Camden Franklin Park, Franklin, TN (AFDC station 453193)”, https://chargecensus.com/stations/tennessee/camden-franklin-park-453193 (data as of October 12, 2026).