ChargeCensus

Btes Btes Office

Available

EV charging station in Bristol, Tennessee on the ChargePoint network — 2 Level 2. US DOE AFDC station 225498.

At a glance

Btes Btes Office is a public EV charging station at 2460 Volunteer Pkwy in Bristol, Tennessee, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 13, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID225498
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateAug 13, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
2460 Volunteer Pkwy
ZIP
37620
Coordinates
36.53191, -82.24716

Within ~15 km

Nearby charging

What kind of charging does Btes Btes Office offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Tennessee average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Btes Btes Office compare with other stations in Bristol?

Bristol has 11 charging stations in the DOE registry with 21 ports, the 16th-most of 164 cities and towns in Tennessee. Btes Btes Office accounts for 10% of the charging ports in Bristol. ChargePoint runs 8 stations in Bristol. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.

Who operates Btes Btes Office?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 616 of those stations are in Tennessee, 48% of the state's 1,273.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 13, 2022, one of 107 stations in Tennessee with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Btes Btes Office have?

Btes Btes Office has 2 charging ports: 2 Level 2.

Does Btes Btes Office have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Btes Btes Office have?

Btes Btes Office has J1772 connectors.

Is Btes Btes Office open to the public?

Yes. Btes Btes Office is listed with public access, and its status is available.

Where is Btes Btes Office?

Btes Btes Office is at 2460 Volunteer Pkwy, Bristol, TN 37620. Its coordinates are 36.53191, -82.24716.

More EV charging around Bristol

Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 225498, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Btes Btes Office, Bristol, TN (AFDC station 225498)”, https://chargecensus.com/stations/tennessee/btes-btes-office-225498 (data as of October 12, 2026).