Brentwood City Hall
AvailableEV charging station in Brentwood, Tennessee on the Blink network — 1 Level 2. US DOE AFDC station 371860.
At a glance
Brentwood City Hall is a public EV charging station at 5211 Maryland Way in Brentwood, Tennessee, on the Blink network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 22, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 371860 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 22, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- Nashville Zoo36 ports
Loop · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Non-networked · Available
What kind of charging does Brentwood City Hall offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 64% below the Tennessee average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Brentwood City Hall compare with other stations in Brentwood?
Brentwood has 36 charging stations in the DOE registry with 91 ports, the 6th-most of 164 cities and towns in Tennessee. Brentwood City Hall accounts for 1% of the charging ports in Brentwood. Blink runs 5 stations in Brentwood. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.
Who operates Brentwood City Hall?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 186 of those stations are in Tennessee, 15% of the state's 1,273.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 22, 2024, one of 166 stations in Tennessee with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Brentwood City Hall have?
Brentwood City Hall has 1 charging port: 1 Level 2.
Does Brentwood City Hall have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Brentwood City Hall have?
Brentwood City Hall has J1772 connectors.
Is Brentwood City Hall open to the public?
Yes. Brentwood City Hall is listed with public access, and its status is available.
Where is Brentwood City Hall?
Brentwood City Hall is at 5211 Maryland Way, Brentwood, TN 37027. Its coordinates are 36.03447, -86.80516.
More EV charging around Brentwood
Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 371860, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Brentwood City Hall, Brentwood, TN (AFDC station 371860)”, https://chargecensus.com/stations/tennessee/brentwood-city-hall-371860 (data as of October 12, 2026).