Bea Station 2 (Lm)
AvailableEV charging station in Brownsville, Tennessee on the ChargePoint network — 1 DC fast. US DOE AFDC station 307579.
At a glance
Bea Station 2 (Lm) is a public EV charging station at 121 Sunny Hill Cove in Brownsville, Tennessee, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Aug 22, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 307579 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 22, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
- NACS (Tesla) — The North American Charging Standard connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 121 Sunny Hill Cove
- City
- Brownsville
- State
- Tennessee
- ZIP
- 38012
- Coordinates
- 35.54019, -89.24646
Within ~15 km
Nearby charging
- Bea Station 1 (Ll)1 ports
ChargePoint · Available
- Bea Station 3 (Rm)1 ports
ChargePoint · Available
- Bea Station 4 (Rr)1 ports
ChargePoint · Available
What kind of charging does Bea Station 2 (Lm) offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 64% below the Tennessee average of 2.8 ports per station. The registry lists 2 connector types: CCS, Combined Charging System — the J1772-based DC fast connector; NACS (Tesla), the North American Charging Standard connector.
How does Bea Station 2 (Lm) compare with other stations in Brownsville?
Brownsville has 4 charging stations in the DOE registry with 4 ports. Bea Station 2 (Lm) accounts for 25% of the charging ports in Brownsville. ChargePoint runs 4 stations in Brownsville. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.
Who operates Bea Station 2 (Lm)?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 616 of those stations are in Tennessee, 48% of the state's 1,273.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 22, 2023, one of 186 stations in Tennessee with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Bea Station 2 (Lm) have?
Bea Station 2 (Lm) has 1 charging port: 1 DC fast.
Does Bea Station 2 (Lm) have DC fast charging?
Yes. The registry lists 1 DC fast port at Bea Station 2 (Lm), with CCS and NACS (Tesla) connectors.
What connectors does Bea Station 2 (Lm) have?
Bea Station 2 (Lm) has CCS and NACS (Tesla) connectors.
Is Bea Station 2 (Lm) open to the public?
Yes. Bea Station 2 (Lm) is listed with public access, and its status is available.
Where is Bea Station 2 (Lm)?
Bea Station 2 (Lm) is at 121 Sunny Hill Cove, Brownsville, TN 38012. Its coordinates are 35.54019, -89.24646.
More EV charging around Brownsville
Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 307579, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Bea Station 2 (Lm), Brownsville, TN (AFDC station 307579)”, https://chargecensus.com/stations/tennessee/bea-station-2-lm-307579 (data as of October 12, 2026).