ChargeCensus

7spc Sevierville

Available

EV charging station in Sevierville, Tennessee on the ChargePoint network — 1 DC fast. US DOE AFDC station 193293.

At a glance

7spc Sevierville is a public EV charging station at 150 Bruce Street in Sevierville, Tennessee, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jul 29, 2021.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID193293
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJul 29, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
150 Bruce Street
City
Sevierville
ZIP
37862
Coordinates
35.86762, -83.56477

Within ~15 km

Nearby charging

What kind of charging does 7spc Sevierville offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 64% below the Tennessee average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does 7spc Sevierville compare with other stations in Sevierville?

Sevierville has 8 charging stations in the DOE registry with 16 ports. 7spc Sevierville accounts for 6% of the charging ports in Sevierville. It is the only ChargePoint station in Sevierville. Statewide, Tennessee has 1,273 stations and 3,577 ports, the 21st-largest station count of the 51 states and DC. The biggest station in Tennessee, Nashville Zoo in Nashville, has 36 ports.

Who operates 7spc Sevierville?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 616 of those stations are in Tennessee, 48% of the state's 1,273.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 29, 2021, one of 203 stations in Tennessee with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does 7spc Sevierville have?

7spc Sevierville has 1 charging port: 1 DC fast.

Does 7spc Sevierville have DC fast charging?

Yes. The registry lists 1 DC fast port at 7spc Sevierville, with CHAdeMO and CCS connectors.

What connectors does 7spc Sevierville have?

7spc Sevierville has CHAdeMO and CCS connectors.

Is 7spc Sevierville open to the public?

Yes. 7spc Sevierville is listed with public access, and its status is available.

Where is 7spc Sevierville?

7spc Sevierville is at 150 Bruce Street, Sevierville, TN 37862. Its coordinates are 35.86762, -83.56477.

More EV charging around Sevierville

Working with Tennessee charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 193293, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “7spc Sevierville, Sevierville, TN (AFDC station 193293)”, https://chargecensus.com/stations/tennessee/7spc-sevierville-193293 (data as of October 12, 2026).