ChargeCensus

Cp60001 Cjdr 2

Available

EV charging station in Sioux Falls, South Dakota on the ChargePoint network — 2 Level 2. US DOE AFDC station 332010.

At a glance

Cp60001 Cjdr 2 is a public EV charging station at 5910 South Louise Avenue in Sioux Falls, South Dakota, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 11, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID332010
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 11, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
5910 South Louise Avenue
ZIP
57108
Coordinates
43.49193, -96.76548

Within ~15 km

Nearby charging

What kind of charging does Cp60001 Cjdr 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the South Dakota average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Cp60001 Cjdr 2 compare with other stations in Sioux Falls?

Sioux Falls has 32 charging stations in the DOE registry with 110 ports, the most of 30 cities and towns in South Dakota. Cp60001 Cjdr 2 accounts for 2% of the charging ports in Sioux Falls. ChargePoint runs 8 stations in Sioux Falls. Statewide, South Dakota has 120 stations and 339 ports, the 49th-largest station count of the 51 states and DC. The biggest station in South Dakota, Sioux Falls Regional Airport (Level 4) in Sioux Falls, has 17 ports.

Who operates Cp60001 Cjdr 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 45 of those stations are in South Dakota, 38% of the state's 120.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 11, 2024, one of 19 stations in South Dakota with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Cp60001 Cjdr 2 have?

Cp60001 Cjdr 2 has 2 charging ports: 2 Level 2.

Does Cp60001 Cjdr 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Cp60001 Cjdr 2 have?

Cp60001 Cjdr 2 has J1772 connectors.

Is Cp60001 Cjdr 2 open to the public?

Yes. Cp60001 Cjdr 2 is listed with public access, and its status is available.

Where is Cp60001 Cjdr 2?

Cp60001 Cjdr 2 is at 5910 South Louise Avenue, Sioux Falls, SD 57108. Its coordinates are 43.49193, -96.76548.

More EV charging around Sioux Falls

Working with South Dakota charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 332010, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Cp60001 Cjdr 2, Sioux Falls, SD (AFDC station 332010)”, https://chargecensus.com/stations/south-dakota/cp60001-cjdr-2-332010 (data as of October 12, 2026).