Bh Energy Bh Station
AvailableEV charging station in Rapid City, South Dakota on the ChargePoint network — 1 Level 2. US DOE AFDC station 374013.
At a glance
Bh Energy Bh Station is a public EV charging station at 7001 Mount Rushmore Road in Rapid City, South Dakota, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 18, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 374013 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 18, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 7001 Mount Rushmore Road
- City
- Rapid City
- State
- South Dakota
- ZIP
- 57702
- Coordinates
- 44.01847, -103.25382
Within ~15 km
Nearby charging
Tesla Destination · Available
Electrify America · Available
Tesla Supercharger · Available
- Horizon Point Rcsc Se #12 ports
ChargePoint · Available
- Horizon Point Hpwestpark 12 ports
ChargePoint · Available
- Liberty Mitsubishi2 ports
Non-networked · Available
What kind of charging does Bh Energy Bh Station offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 65% below the South Dakota average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Bh Energy Bh Station compare with other stations in Rapid City?
Rapid City has 22 charging stations in the DOE registry with 36 ports, the 2nd-most of 30 cities and towns in South Dakota. Bh Energy Bh Station accounts for 3% of the charging ports in Rapid City. ChargePoint runs 14 stations in Rapid City. Statewide, South Dakota has 120 stations and 339 ports, the 49th-largest station count of the 51 states and DC. The biggest station in South Dakota, Sioux Falls Regional Airport (Level 4) in Sioux Falls, has 17 ports.
Who operates Bh Energy Bh Station?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 45 of those stations are in South Dakota, 38% of the state's 120.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 18, 2024, one of 19 stations in South Dakota with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Bh Energy Bh Station have?
Bh Energy Bh Station has 1 charging port: 1 Level 2.
Does Bh Energy Bh Station have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Bh Energy Bh Station have?
Bh Energy Bh Station has J1772 connectors.
Is Bh Energy Bh Station open to the public?
Yes. Bh Energy Bh Station is listed with public access, and its status is available.
Where is Bh Energy Bh Station?
Bh Energy Bh Station is at 7001 Mount Rushmore Road, Rapid City, SD 57702. Its coordinates are 44.01847, -103.25382.
More EV charging around Rapid City
Working with South Dakota charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 374013, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Bh Energy Bh Station, Rapid City, SD (AFDC station 374013)”, https://chargecensus.com/stations/south-dakota/bh-energy-bh-station-374013 (data as of October 12, 2026).