ChargeCensus

Optimus Cpo Btc Ninetysix 2

Available

EV charging station in Ninety Six, South Carolina on the ChargePoint network — 1 DC fast. US DOE AFDC station 458659.

At a glance

Optimus Cpo Btc Ninetysix 2 is a public EV charging station at 97 Main Street East in Ninety Six, South Carolina, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS connectors. The US DOE registry lists it as available, open since May 2, 2026.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID458659
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 2, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
97 Main Street East
City
Ninety Six
ZIP
29666
Coordinates
34.17520, -82.02247

Within ~15 km

Nearby charging

What kind of charging does Optimus Cpo Btc Ninetysix 2 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 68% below the South Carolina average of 3.1 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Optimus Cpo Btc Ninetysix 2 compare with other stations in Ninety Six?

Ninety Six has 3 charging stations in the DOE registry with 4 ports. Optimus Cpo Btc Ninetysix 2 accounts for 25% of the charging ports in Ninety Six. ChargePoint runs 2 stations in Ninety Six. Statewide, South Carolina has 788 stations and 2,463 ports, the 26th-largest station count of the 51 states and DC. The biggest station in South Carolina, Manning, SC - Tesla Supercharger in Manning, has 60 ports.

Who operates Optimus Cpo Btc Ninetysix 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 268 of those stations are in South Carolina, 34% of the state's 788.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 2, 2026, one of 136 stations in South Carolina with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Optimus Cpo Btc Ninetysix 2 have?

Optimus Cpo Btc Ninetysix 2 has 1 charging port: 1 DC fast.

Does Optimus Cpo Btc Ninetysix 2 have DC fast charging?

Yes. The registry lists 1 DC fast port at Optimus Cpo Btc Ninetysix 2, with CCS connectors.

What connectors does Optimus Cpo Btc Ninetysix 2 have?

Optimus Cpo Btc Ninetysix 2 has CCS connectors.

Is Optimus Cpo Btc Ninetysix 2 open to the public?

Yes. Optimus Cpo Btc Ninetysix 2 is listed with public access, and its status is available.

Where is Optimus Cpo Btc Ninetysix 2?

Optimus Cpo Btc Ninetysix 2 is at 97 Main Street East, Ninety Six, SC 29666. Its coordinates are 34.17520, -82.02247.

More EV charging around Ninety Six

Working with South Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 458659, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Optimus Cpo Btc Ninetysix 2, Ninety Six, SC (AFDC station 458659)”, https://chargecensus.com/stations/south-carolina/optimus-cpo-btc-ninetysix-2-458659 (data as of October 12, 2026).