Mb Area Chamber Mbacc EV
AvailableEV charging station in Myrtle Beach, South Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 302739.
At a glance
Mb Area Chamber Mbacc EV is a public EV charging station at 1200 N Oak St in Myrtle Beach, South Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 18, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 302739 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 18, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1200 N Oak St
- City
- Myrtle Beach
- State
- South Carolina
- ZIP
- 29577
- Coordinates
- 33.69790, -78.88049
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Destination · Available
Tesla Destination · Available
Electrify America · Available
What kind of charging does Mb Area Chamber Mbacc EV offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 36% below the South Carolina average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Mb Area Chamber Mbacc EV compare with other stations in Myrtle Beach?
Myrtle Beach has 39 charging stations in the DOE registry with 112 ports, the 5th-most of 130 cities and towns in South Carolina. Mb Area Chamber Mbacc EV accounts for 2% of the charging ports in Myrtle Beach. ChargePoint runs 14 stations in Myrtle Beach. Statewide, South Carolina has 788 stations and 2,463 ports, the 26th-largest station count of the 51 states and DC. The biggest station in South Carolina, Manning, SC - Tesla Supercharger in Manning, has 60 ports.
Who operates Mb Area Chamber Mbacc EV?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 268 of those stations are in South Carolina, 34% of the state's 788.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 18, 2023, one of 122 stations in South Carolina with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Mb Area Chamber Mbacc EV have?
Mb Area Chamber Mbacc EV has 2 charging ports: 2 Level 2.
Does Mb Area Chamber Mbacc EV have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Mb Area Chamber Mbacc EV have?
Mb Area Chamber Mbacc EV has J1772 connectors.
Is Mb Area Chamber Mbacc EV open to the public?
Yes. Mb Area Chamber Mbacc EV is listed with public access, and its status is available.
Where is Mb Area Chamber Mbacc EV?
Mb Area Chamber Mbacc EV is at 1200 N Oak St, Myrtle Beach, SC 29577. Its coordinates are 33.69790, -78.88049.
More EV charging around Myrtle Beach
Working with South Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 302739, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Mb Area Chamber Mbacc EV, Myrtle Beach, SC (AFDC station 302739)”, https://chargecensus.com/stations/south-carolina/mb-area-chamber-mbacc-ev-302739 (data as of October 12, 2026).