ChargeCensus

Lee State Park

Available

EV charging station in Bishopville, South Carolina on the Rivian Waypoints network — 2 Level 2. US DOE AFDC station 391281.

At a glance

Lee State Park is a public EV charging station at 487 Loop Rd in Bishopville, South Carolina, on the Rivian Waypoints network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 8, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 3 nearby

Station record

DOE registry record

FieldValue
AFDC station ID391281
NetworkRivian Waypoints
StatusAvailable (E)
AccessPublic
FacilityPublic site
Open dateNov 8, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Rivian Waypoints

Operates 207 stations in the DOE registry — view the full network →

Location

Address
487 Loop Rd
City
Bishopville
ZIP
29010
Coordinates
34.19522, -80.18255

Within ~15 km

Nearby charging

What kind of charging does Lee State Park offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 36% below the South Carolina average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a public site location.

How does Lee State Park compare with other stations in Bishopville?

Bishopville has 4 charging stations in the DOE registry with 16 ports. Lee State Park accounts for 13% of the charging ports in Bishopville. It is the only Rivian Waypoints station in Bishopville. Statewide, South Carolina has 788 stations and 2,463 ports, the 26th-largest station count of the 51 states and DC. The biggest station in South Carolina, Manning, SC - Tesla Supercharger in Manning, has 60 ports.

Who operates Lee State Park?

Rivian Waypoints operates 207 stations in the registry across 28 states, with 540 Level 2 ports in total. 27 of those stations are in South Carolina, 3% of the state's 788.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 8, 2023, one of 122 stations in South Carolina with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Lee State Park have?

Lee State Park has 2 charging ports: 2 Level 2.

Does Lee State Park have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Lee State Park have?

Lee State Park has J1772 connectors.

Is Lee State Park open to the public?

Yes. Lee State Park is listed with public access, and its status is available.

Where is Lee State Park?

Lee State Park is at 487 Loop Rd, Bishopville, SC 29010. Its coordinates are 34.19522, -80.18255.

More EV charging around Bishopville

Working with South Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 391281, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Lee State Park, Bishopville, SC (AFDC station 391281)”, https://chargecensus.com/stations/south-carolina/lee-state-park-391281 (data as of October 12, 2026).