Edisto Beach State Park
AvailableEV charging station in Edisto Island, South Carolina on the Rivian Waypoints network — 2 Level 2. US DOE AFDC station 391186.
At a glance
Edisto Beach State Park is a public EV charging station at 8377 State Cabin Rd in Edisto Island, South Carolina, on the Rivian Waypoints network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 9, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 391186 |
| Network | Rivian Waypoints |
| Status | Available (E) |
| Access | Public |
| Facility | Public site |
| Open date | Aug 9, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 8377 State Cabin Rd
- City
- Edisto Island
- State
- South Carolina
- ZIP
- 29438
- Coordinates
- 32.51167, -80.30213
Within ~15 km
Nearby charging
Blink · Available
Blink · Available
Blink · Available
Blink · Temporarily unavailable
Blink · Available
What kind of charging does Edisto Beach State Park offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 36% below the South Carolina average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a public site location.
How does Edisto Beach State Park compare with other stations in Edisto Island?
Edisto Island has 1 charging station in the DOE registry with 2 ports. It is the only Rivian Waypoints station in Edisto Island. Statewide, South Carolina has 788 stations and 2,463 ports, the 26th-largest station count of the 51 states and DC. The biggest station in South Carolina, Manning, SC - Tesla Supercharger in Manning, has 60 ports.
Who operates Edisto Beach State Park?
Rivian Waypoints operates 207 stations in the registry across 28 states, with 540 Level 2 ports in total. 27 of those stations are in South Carolina, 3% of the state's 788.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 9, 2023, one of 122 stations in South Carolina with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Edisto Beach State Park have?
Edisto Beach State Park has 2 charging ports: 2 Level 2.
Does Edisto Beach State Park have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Edisto Beach State Park have?
Edisto Beach State Park has J1772 connectors.
Is Edisto Beach State Park open to the public?
Yes. Edisto Beach State Park is listed with public access, and its status is available.
Where is Edisto Beach State Park?
Edisto Beach State Park is at 8377 State Cabin Rd, Edisto Island, SC 29438. Its coordinates are 32.51167, -80.30213.
More EV charging around Edisto Island
Working with South Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 391186, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Edisto Beach State Park, Edisto Island, SC (AFDC station 391186)”, https://chargecensus.com/stations/south-carolina/edisto-beach-state-park-391186 (data as of October 12, 2026).