ChargeCensus

Colleton State Park

Available

EV charging station in Walterboro, South Carolina on the Rivian Waypoints network — 2 Level 2. US DOE AFDC station 391125.

At a glance

Colleton State Park is a public EV charging station at 147 Wayside Lane in Walterboro, South Carolina, on the Rivian Waypoints network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 31, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 5 nearby

Station record

DOE registry record

FieldValue
AFDC station ID391125
NetworkRivian Waypoints
StatusAvailable (E)
AccessPublic
FacilityPublic site
Open dateMay 31, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Rivian Waypoints

Operates 207 stations in the DOE registry — view the full network →

Location

Address
147 Wayside Lane
City
Walterboro
ZIP
29488
Coordinates
33.06260, -80.61612

Within ~15 km

Nearby charging

What kind of charging does Colleton State Park offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 36% below the South Carolina average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a public site location.

How does Colleton State Park compare with other stations in Walterboro?

Walterboro has 5 charging stations in the DOE registry with 39 ports. Colleton State Park accounts for 5% of the charging ports in Walterboro. It is the only Rivian Waypoints station in Walterboro. Statewide, South Carolina has 788 stations and 2,463 ports, the 26th-largest station count of the 51 states and DC. The biggest station in South Carolina, Manning, SC - Tesla Supercharger in Manning, has 60 ports.

Who operates Colleton State Park?

Rivian Waypoints operates 207 stations in the registry across 28 states, with 540 Level 2 ports in total. 27 of those stations are in South Carolina, 3% of the state's 788.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 31, 2023, one of 122 stations in South Carolina with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Colleton State Park have?

Colleton State Park has 2 charging ports: 2 Level 2.

Does Colleton State Park have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Colleton State Park have?

Colleton State Park has J1772 connectors.

Is Colleton State Park open to the public?

Yes. Colleton State Park is listed with public access, and its status is available.

Where is Colleton State Park?

Colleton State Park is at 147 Wayside Lane, Walterboro, SC 29488. Its coordinates are 33.06260, -80.61612.

More EV charging around Walterboro

Working with South Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 391125, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Colleton State Park, Walterboro, SC (AFDC station 391125)”, https://chargecensus.com/stations/south-carolina/colleton-state-park-391125 (data as of October 12, 2026).