ChargeCensus

Camp Hall Info Center

Available

EV charging station in Ridgeville, South Carolina, not on a charging network — 2 Level 2. US DOE AFDC station 212644.

At a glance

Camp Hall Info Center is a public EV charging station at 114 Three Point Dr in Ridgeville, South Carolina, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 28, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 4 nearby

Station record

DOE registry record

FieldValue
AFDC station ID212644
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityOffice building
Open dateJan 28, 2022
Last updated at sourceDec 3, 2025

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
114 Three Point Dr
City
Ridgeville
ZIP
29472
Coordinates
33.06561, -80.31978

Within ~15 km

Nearby charging

What kind of charging does Camp Hall Info Center offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 36% below the South Carolina average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a office building location.

How does Camp Hall Info Center compare with other stations in Ridgeville?

Ridgeville has 3 charging stations in the DOE registry with 12 ports. Camp Hall Info Center accounts for 17% of the charging ports in Ridgeville. Statewide, South Carolina has 788 stations and 2,463 ports, the 26th-largest station count of the 51 states and DC. The biggest station in South Carolina, Manning, SC - Tesla Supercharger in Manning, has 60 ports.

Who operates Camp Hall Info Center?

Camp Hall Info Center is listed as non-networked: its chargers are not run through a charging-network account. South Carolina has 174 non-networked stations, 22% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 28, 2022, one of 72 stations in South Carolina with a 2022 open date. The station's record was last updated at the source on Dec 3, 2025.

Frequently asked questions

How many chargers does Camp Hall Info Center have?

Camp Hall Info Center has 2 charging ports: 2 Level 2.

Does Camp Hall Info Center have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Camp Hall Info Center have?

Camp Hall Info Center has J1772 connectors.

Is Camp Hall Info Center open to the public?

Yes. Camp Hall Info Center is listed with public access, and its status is available.

Where is Camp Hall Info Center?

Camp Hall Info Center is at 114 Three Point Dr, Ridgeville, SC 29472. Its coordinates are 33.06561, -80.31978.

More EV charging around Ridgeville

Working with South Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 212644, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Camp Hall Info Center, Ridgeville, SC (AFDC station 212644)”, https://chargecensus.com/stations/south-carolina/camp-hall-info-center-212644 (data as of October 12, 2026).