ChargeCensus

Building 500

Available

EV charging station in Summerville, South Carolina on the Blink network — 2 Level 2. US DOE AFDC station 214930.

At a glance

Building 500 is a public EV charging station at 500 Raleigh Circle in Summerville, South Carolina, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 7, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID214930
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateDec 7, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.00-$1.00/Hr Variable Parking Fee

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
500 Raleigh Circle
ZIP
29486
Coordinates
33.08437, -80.11076

Within ~15 km

Nearby charging

What kind of charging does Building 500 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 36% below the South Carolina average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.00-$1.00/Hr Variable Parking Fee”.

How does Building 500 compare with other stations in Summerville?

Summerville has 25 charging stations in the DOE registry with 65 ports, the 6th-most of 130 cities and towns in South Carolina. Building 500 accounts for 3% of the charging ports in Summerville. Blink runs 11 stations in Summerville. Statewide, South Carolina has 788 stations and 2,463 ports, the 26th-largest station count of the 51 states and DC. The biggest station in South Carolina, Manning, SC - Tesla Supercharger in Manning, has 60 ports.

Who operates Building 500?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 64 of those stations are in South Carolina, 8% of the state's 788.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 7, 2021, one of 61 stations in South Carolina with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Building 500 have?

Building 500 has 2 charging ports: 2 Level 2.

Does Building 500 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Building 500 have?

Building 500 has J1772 connectors.

Is charging at Building 500 free?

Pricing as reported to the DOE registry: $0.00-$1.00/Hr Variable Parking Fee.

Is Building 500 open to the public?

Yes. Building 500 is listed with public access, and its status is available.

Where is Building 500?

Building 500 is at 500 Raleigh Circle, Summerville, SC 29486. Its coordinates are 33.08437, -80.11076.

More EV charging around Summerville

Working with South Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 214930, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Building 500, Summerville, SC (AFDC station 214930)”, https://chargecensus.com/stations/south-carolina/building-500-214930 (data as of October 12, 2026).